Workflow
Mineral Resource Estimate
icon
Search documents
Omai Gold Files NI 43-101 Technical Report Supporting an Updated Mineral Resource Estimate on Its Omai Gold Property in Guyana
Newsfile· 2025-10-09 20:00
Omai Gold Files NI 43-101 Technical Report Supporting an Updated Mineral Resource Estimate on Its Omai Gold Property in GuyanaOctober 09, 2025 4:00 PM EDT | Source: Omai Gold Mines Corp.Toronto, Ontario--(Newsfile Corp. - October 9, 2025) - Omai Gold Mines Corp. (TSXV: OMG) (OTCQB: OMGGF) ("Omai Gold" or the "Company") announces that a National Instrument 43-101 Technical Report dated October 9, 2025 (the "Report") has been filed on the SEDAR+ website www.sedarplus.ca in support of the updated ...
Eloro Resources Ltd. Intersects the Longest Zinc Interval to Date at its Iska Iska Project, Potosí Department, Bolivia with 456 Metres Grading 1.72% Zn including 190.5m grading 2.35% Zn in Hole DSB-88
Globenewswire· 2025-10-09 11:00
Highlights: This intersection in Hole DSB-88 is the longest zinc interval discovered to date at Iska Iska and is also outside the current resource limit further expanding the Silver-Zinc (Ag-Zn) Epithermal Domain located in the eastern margin of the potential Santa Barbara starter pit.DSB-89, a step-out hole collared 50m northwest of hole DSB-88, intersected a number of higher grade silver, tin and zinc intervals: 13.50m grading 74.64 g/t Ag, 0.81% Pb, 0.24% Sn beginning at 50.8m;19.50m grading 41.52 g/t A ...
Green Bay Copper-Gold Project, Canada: Exceptional high-grade copper and gold results pave the way for a significant Mineral Resource Estimate update this quarter
Globenewswire· 2025-10-08 22:00
Six rig drill campaign continues underground; Step-out results from extension drilling at Ming Mine expected in the coming weeks; Regional exploration programmes underway KEY POINTS Latest drill results demonstrate both the continuity, quality and scale of the copper and gold mineralisation at Green BayResults from infill drilling targeting the upper high-grade copper and gold rich Volcanogenic Massive Sulphide (VMS) zones demonstrate consistent high-grade mineralisation, including: 4.4m @ 19.5% CuEq1 (3.1 ...
Koryx Files Updated PEA for the Haib Copper Project, Southern Namibia
Globenewswire· 2025-10-08 16:45
VANCOUVER, British Columbia, Oct. 08, 2025 (GLOBE NEWSWIRE) -- Koryx Copper Inc. (“Koryx” or the "Company") (TSX-V: KRY) is pleased to announce filing of the recently completed Preliminary Economic Assessment (“PEA”) of the Company’s 100%-owned, flagship Haib Copper Project (“Haib” or the “Project”) in southern Namibia. The results of the PEA were announced in the Company's news release on September 4, 2025. The technical report comprising the PEA is entitled, “Preliminary Economic Assessment of the Haib Co ...
Nova Pacific Reports Final Assay Results from Phase 1 Drilling at the Lara VMS Project
Newsfile· 2025-10-08 12:30
Nova Pacific Reports Final Assay Results from Phase 1 Drilling at the Lara VMS ProjectOctober 08, 2025 8:30 AM EDT | Source: Nova Pacific Metals Corp.Vancouver, British Columbia--(Newsfile Corp. - October 8, 2025) - Nova Pacific Metals Corp. (CSE: NVPC) (OTCQB: NVPCF) (FSE: YQ10) (WKN: A40GFH) ("Nova Pacific" or the "Company") is pleased to report the final batch of assay results from seven drillholes totalling 2,228 metres completed during the Company's 8,660-metre Phase 1 drill program at th ...
Newcore Gold Increases Drill Program to 45,000 Metres at the Enchi Gold Project, Ghana
Globenewswire· 2025-10-08 10:20
VANCOUVER, British Columbia, Oct. 08, 2025 (GLOBE NEWSWIRE) -- Newcore Gold Ltd. ("Newcore" or the "Company") (TSX-V: NCAU, OTCQX: NCAUF) is pleased to announce that on the back of the success achieved to date with drilling at the Company’s 100% owned Enchi Gold Project ("Enchi" or the "Project") in Ghana, and a strong cash position of approximately $10 million after the exercise of warrants that expired on September 26, 2025, the Company has increased its 2024 - 2025 drill program to 45,000 metres. Drillin ...
McFarlane Issues NI 43-101 Mineral Resource Estimate on Its Juby Gold Project
Accessnewswire· 2025-10-07 11:15
Highlights of Mineral Resource estimate 3.17 million inferred ounces gold at 0.89 gram per tonne (gpt or g/t) gold 1.01 million indicated ounces gold at 0.98 gpt gold using long term gold price of US$2500/oz (see Table 1 and note 1) Resource Sensitivities at US $3750/oz gold yield 5.42 million ounces at 0.87 gpt gold contained in 194 Million tonnes (see Table 2 and note 1) New underground resources defined to augment open pit resources McFarlane applies for exploration permit at Juby TORONTO, ON / ACCESS Ne ...
Amargosa Bauxite-Gallium Project Mineral Resource Estimate
Globenewswire· 2025-10-03 12:30
Core Viewpoint - Brazilian Rare Earths Limited (BRE) has announced a Maiden Mineral Resource Estimate at the Amargosa Bauxite-Gallium Project, highlighting a significant bauxite resource with premium alumina grades and substantial contained gallium [1][6]. Bauxite Mineral Resource Estimate - The total mineral resource is estimated at 568 million tonnes (Mt) with a Total Available Alumina (TAA) of 29.8% [2]. - The resource includes 98 Mt of Direct-Ship Bauxite with a TAA of 41.9% and 470 Mt of Beneficiable Bauxite with a TAA of 27.3% [4]. Gallium Mineral Resource Estimate - The project contains 27,098,000 kg of gallium, with an average concentration of 47.7 parts per million (ppm) [2][3]. - Direct-Ship Bauxite has a gallium concentration of 51.6 ppm, while Beneficiable Bauxite has 46.9 ppm [3]. Strategic Importance - The contained gallium positions Amargosa as a key player in emerging supply chains for semiconductors, high-performance permanent magnets, and defense applications [3]. - The low reactive silica index (RSI) of the bauxite enhances alumina recovery and aligns with tightening refinery feed specifications [4]. Logistics and Infrastructure - The project benefits from direct highway access to bulk-export logistics in a Tier-1 jurisdiction, facilitating a capital-efficient direct-ship bauxite operation [7][8]. - A Memorandum of Understanding (MoU) has been signed with the Port of Enseada for mine-to-port export logistics [8]. Growth and Development Pathways - A near-term Scoping Study is planned to explore development pathways and long-term value creation options for Amargosa [7]. - The project has significant exploration upside, supported by historical drilling data, providing potential for further resource expansion [8]. Next Steps - Upcoming initiatives include a Scoping Study by the end of 2025, bauxite upgrade test-work, and resource drilling to assess growth and optimization [8].
PAN GLOBAL AWARDED LARGE, HIGHLY PROSPECTIVE MINERAL RIGHTS' BLOCK CONTIGUOUS TO ESCACENA PROJECT, SOUTHERN SPAIN
Prnewswire· 2025-10-02 17:05
Accessibility StatementSkip Navigation TSXV:Â PGZÂ |Â Â Â OTCQB: PGZFF Â |Â FRA: 2EU VANCOUVER, BC, Oct. 2, 2025 /PRNewswire/ - Pan Global Resources Inc. ("Pan Global" or the "Company") (TSXV: PGZ) (OTCQB: PGZFF) (FRA: 2EU) is pleased to announce the award of mineral rights to three contiguous blocks adjoining the Company's 100%-owned Escacena Project ("Escacena") through a competitive public tender process. The new mineral rights expand the Company's landholding at Escacena on the Iberian Pyrite Belt by 74 ...
Erdene Announces Updated Resource for the Zuun Mod Molybdenum-Copper Deposit
Globenewswire· 2025-10-02 11:00
HIGHLIGHTS 100% owned license hosts one of Asia’s largest undeveloped molybdenum-copper depositsOnly 35 kilometers from Erdene Mongol’s Bayan Khundii Gold Mine in region of growing infrastructure and 180 kilometres from China, the world’s largest molybdenum consumerThe updated resource estimate, when compared to the previous, demonstrates a significant increase: 22% increase in Measured and Indicated molybdenum (“Mo”) resources to 333 million pound (“Mlbs”) and 95% increase in Inferred Mo resources to 300 M ...