储能配置与调度

Search documents
中国能建江苏院申请一种考虑断面潮流功率波动优化与源网荷储协同的储能配置与调度方法和装置专利,避免容量冗余或不足
Jin Rong Jie· 2025-08-16 07:15
Group 1 - The company, China Energy Construction Group Jiangsu Electric Power Design Institute Co., Ltd., has applied for a patent related to energy storage configuration and scheduling methods, focusing on optimizing power flow fluctuations and coordination among sources, networks, loads, and storage [1] - The patent application was filed on May 2025, and the public number is CN120497982A, indicating the company's active engagement in innovative energy solutions [1] - The proposed method involves a dual-layer mixed-integer programming model to determine optimal energy storage capacity and daily scheduling curves, ensuring economic efficiency and avoiding redundancy or insufficiency in storage capacity [1] Group 2 - China Energy Construction Group Jiangsu Electric Power Design Institute Co., Ltd. was established in 1990 and is located in Nanjing, with a registered capital of 600 million RMB [2] - The company has invested in 23 enterprises and participated in 4,312 bidding projects, showcasing its extensive involvement in the energy sector [2] - The company holds 957 patents and has 99 administrative licenses, reflecting its strong focus on research and development in the energy industry [2]