区域综合交通运输体系完善
Search documents
柳梧铁路全线54座隧道全部贯通 预计明年建成通车
Yang Shi Xin Wen· 2025-09-28 16:13
Core Viewpoint - The successful completion of the Taiping Tunnel on September 28 marks a significant milestone for the Liuzhou-Wuzhou Railway project, with all 54 tunnels now completed, laying a solid foundation for subsequent track-laying work [1][5]. Group 1: Project Overview - The Liuzhou-Wuzhou Railway has a total length of 238.167 kilometers, with a bridge-tunnel ratio of 72.5%. It is classified as a national railway Class I, double-track electrified line, designed for a speed of 160 kilometers per hour, connecting cities such as Liuzhou, Laibin, Guigang, and Wuzhou, and includes 10 stations [1][5]. - The project was fully launched in September 2022, with an approved budget of 33.872 billion yuan and a total construction period of 4 years, expected to be completed and operational by next year [5]. Group 2: Technical Challenges - The Taiping Tunnel, located in Wuxuan County, Laibin City, is 4,628 meters long with a maximum depth of approximately 267 meters. It faces complex geological conditions, including karst, layered, and fault zones, as well as soft clay and expansive soil, presenting multiple risks such as pressure imbalance, water inflow, mud bursts, and collapses, categorizing it as an I-level risk tunnel [3][5]. Group 3: Economic and Regional Impact - The Liuzhou-Wuzhou Railway is a crucial component of the Liuzhou-Guangzhou railway and is an important ordinary-speed railway corridor in the southwest region to the Guangdong-Hong Kong-Macao Greater Bay Area, significantly enhancing transportation connectivity and promoting high-quality economic and social development in the surrounding areas [5].