Workflow
固定资产投资项目节能审查
icon
Search documents
固投项目开工前须进行节能审查
Liao Ning Ri Bao· 2025-11-17 01:12
Core Viewpoint - The implementation of the "Liaoning Province Fixed Asset Investment Project Energy Saving Review and Carbon Emission Evaluation Implementation Measures" aims to strengthen energy consumption and carbon emission management for fixed asset investment projects, replacing the previous measures [1][2]. Group 1: Energy Saving Review Management - The energy saving review for fixed asset investment projects is to be managed by energy saving review authorities at various levels, primarily at the municipal level and above [1]. - Energy saving review authorities are required to develop and publicly disclose service guidelines detailing the application materials, acceptance methods, review conditions, processing procedures, and timelines for the review process [1][2]. - The energy saving review process will be integrated into the online approval and supervision platform for investment projects in Liaoning Province, allowing for online acceptance, processing, supervision, and service [1]. Group 2: Classification and Responsibility - The energy saving review will be conducted in a hierarchical and classified manner, with specific projects requiring review by the National Development and Reform Commission (NDRC) based on energy consumption thresholds [2]. - Projects with an annual comprehensive energy consumption of 50,000 tons of standard coal or more, or annual coal consumption of 50,000 tons or more, will be reviewed by the NDRC [2]. - Provincial and municipal energy saving review authorities will handle reviews for projects with lower energy consumption thresholds, ensuring that carbon emission evaluations are conducted simultaneously for projects reviewed by the NDRC and provincial authorities [2]. Group 3: Compliance and Enforcement - Before a fixed asset investment project can commence production or use, it must undergo verification of compliance with the energy saving review opinions and reports regarding production processes, energy equipment, energy-saving and carbon reduction technologies, and energy metering devices [3]. - Projects that commence construction or production without proper energy saving review or that fail to pass the review will be ordered to cease construction or production by the relevant energy management authorities, with a deadline for rectification [3].