Workflow
海上风电施工
icon
Search documents
我省海上风电施工领域再添重器
Xin Lang Cai Jing· 2026-01-17 23:55
Core Viewpoint - The delivery of the multifunctional submarine cable installation vessel "Huaxia Dejing 108" marks a significant advancement in marine engineering capabilities, particularly for offshore wind power projects and other marine cable operations [1]. Group 1: Vessel Specifications - "Huaxia Dejing 108" measures 171 meters in length, 38 meters in width, and has a depth of 12.8 meters, with a total cable carrying capacity of 18,000 tons, making it the largest in terms of single cable drum capacity among existing marine engineering vessels [1]. - The vessel is equipped with advanced technologies including a DP2 dynamic positioning system, a 5-meter deep burial plow, a modular 6-meter deep burial plow, an ROV post-lay trenching machine, a wave compensation corridor, a Mackay modeling system, and an intelligent engine room system [1]. Group 2: Operational Capabilities - The vessel is designed to undertake various tasks such as the transportation, installation, maintenance, and repair of submarine cables for offshore wind farms, as well as the installation of umbilical cables for offshore oil fields, laying of transnational submarine cables, and construction of island power supply cables [1]. - It is capable of operating under all weather conditions and can meet the operational demands of large-scale, clustered offshore wind farms in deep water and remote sea areas throughout the year [1].