Workflow
电动汽车充电基础设施补贴政策
icon
Search documents
吉林:配建新型储能设备的充电站,给予100元/kWh建设补贴
Core Viewpoint - The article discusses the revised implementation details for the construction and operation subsidies for electric vehicle charging stations in Jilin Province, aiming to enhance the charging infrastructure and promote the use of electric vehicles [2][5]. Group 1: Support Scope and Standards - The subsidies will be provided for charging facilities that are operational and connected to the provincial new energy monitoring platform, using a post-event reward method for construction and operation support [8][9]. - Construction subsidies for public service charging facilities will be standardized, with direct current (DC) charging facilities receiving 600 yuan per kilowatt and other public charging facilities receiving 300 yuan per kilowatt [9][11]. - For high-tech smart charging stations, subsidies will be provided for integrated photovoltaic systems at 100 yuan per kilowatt and for energy storage systems at 100 yuan per kilowatt-hour [14]. Group 2: Demonstration Projects and Special Projects - Starting January 1, 2025, demonstration projects in areas with insufficient charging infrastructure will receive a one-time construction subsidy, while other projects will not receive construction subsidies [9][10]. - Specific projects such as intercity rapid charging stations and rural convenience charging stations have defined requirements and subsidy standards, with maximum subsidies not exceeding 50% of the equipment purchase price [11][12]. Group 3: Operation Subsidies - Annual assessments will be conducted on the operational quality of charging stations, with a tiered subsidy system based on performance ratings, ranging from 0.1 to 0.3 yuan per kilowatt-hour [15][30]. - Charging stations that do not meet operational standards or have significant negative incidents will be disqualified from receiving subsidies [30]. Group 4: Application and Review Process - Charging station operators must meet specific conditions and submit required documentation to apply for subsidies, including project approval and compliance with national standards [17][18]. - The application process involves multiple levels of review, including initial assessments at the county level and final approvals by provincial authorities [20][21]. Group 5: Performance Management and Supervision - The provincial energy bureau will conduct performance evaluations and monitoring of the projects, ensuring compliance and proper use of funds [25][27]. - Any fraudulent activities or violations will lead to penalties, including the potential recovery of funds and disqualification from future applications [26][27].