绿车充绿电
Search documents
枣庄供电:“绿车充绿电”业态助力建设低碳万亩榴园
Qi Lu Wan Bao Wang· 2025-10-17 01:29
Core Insights - The integrated charging station in Jiaquan Village has successfully operated for 9 months, charging over 400 vehicles and generating 35,000 kWh of electricity through solar and wind power, exemplifying the implementation of the "dual carbon" strategy [1][4] Group 1: Charging Station Overview - The "Green Car Charging Green Electricity" model combines electric vehicles with renewable energy, contributing to carbon reduction efforts [4] - The charging station is the first pilot project of its kind in a rural area, featuring a 16.2 kW solar panel roof and two 120 kW interactive DC charging piles, along with a 100 kW/200 kWh energy storage system and a 5 kW wind turbine [4] - The microgrid technology enables 24-hour uninterrupted green electricity supply to the charging piles [4] Group 2: Infrastructure Development - The State Grid Zaozhuang Company has prioritized the construction of charging infrastructure in the 10,000-acre pomegranate garden, establishing three charging stations with a total capacity of 360 kW [7] - These stations are strategically located to support the agricultural processing and tourism characteristics of the area, creating a 2.5 km charging service radius [7] - A number of mobile charging piles have also been deployed to meet the demand for green travel and rapid charging in the scenic area [7]