Copper Porphyry System
Search documents
Erdene Intersects 30 Metres of 1.25% Copper in Khuvyn Khar Porphyry System
Globenewswire· 2026-01-14 12:30
Highlights: Intersected 65 metres averaging 0.63% copper (“Cu”) and 2.9 g/t silver (“Ag”) mineralization, including 30 metres averaging 1.25% Cu and 6.1 g/t AgMineralized zone extends from 238 meters downhole, ending in mineralization at 450 metres, characterized by moderate to intense potassic alteration with associated copper mineralizationHole is three kilometres from the Zuun Mod molybdenum-copper deposit and interpreted to be part of the same porphyry systemLocated on a wholly owned mining license 35 k ...