Gold Mineralization Exploration
Search documents
Beauce Gold Fields Advances Saddle-Reef Discovery with March Drilling
Thenewswire· 2026-02-09 14:00
Core Viewpoint - Beauce Gold Fields is set to initiate a follow-up diamond drilling program at the Grondin Zone in March 2026, aimed at further exploring the gold-bearing Saddle-Reef antiform structure [1][2]. Exploration Program - The upcoming drilling program will consist of up to 1,500 meters of diamond drilling to test selected targets along strike and at depth within the Grondin Zone [1]. - The drilling targets have been refined using a recently completed 3-D geological model, integrating data from previous drilling campaigns in 2023 and 2025 [4]. - The program will focus on testing down-dip extensions of known mineralized zones, which have shown a continuous mineralized corridor that remains open laterally and at depth [4][5]. Geological Context - The Grondin Zone has been systematically explored since 2023, with multiple diamond drill campaigns, geophysical surveys, geological mapping, and limited bulk sampling conducted [5]. - Previous drilling confirmed gold mineralization associated with a Saddle Reef antiform geometry, traced over several hundred meters and remaining open both along strike and at depth [5][6]. - The exploration strategy aims to identify bedrock sources of historic placer gold deposits, with gold-bearing mineralization confirmed along a 4-kilometer strike length from the Grondin Zone [6]. Structural Insights - The antiform-hosted structure is interpreted as a likely bedrock source contributing to historical placer gold deposits within the Saint-Simon-les-Mines paleoplacer channel [7]. - Induced polarization surveys and geological interpretation have outlined an approximately 8-kilometer antiform Saddle Reef structural corridor, providing a framework for ongoing exploration [6]. Company Background - Beauce Gold Fields focuses on exploring and developing the largest placer gold district in eastern North America, with the objective of tracing old placer gold workings back to a bedrock source [8]. - The company's flagship property is the Saint-Simon-les-Mines gold project, historically significant as the site of Canada's first gold rush [8].
CORRECTION FROM SOURCE: Dryden Gold Reports 6.4 g/t Gold over 3.30 Meters Inc. 15.10 g/t Gold over 1.00 Meters in New High-Grade Footwall Structure at Pearl
TMX Newsfile· 2026-02-04 13:56
Core Viewpoint - Dryden Gold Corp. has announced significant new drill results from the Pearl zone in the Gold Rock Target Area, indicating continued expansion of mineralization and the discovery of new high-grade exploration targets [2][3]. Summary by Sections Drill Results - The company drilled five new holes totaling approximately 1,600 meters along a 600-meter strike length from Jubilee to Pearl, revealing high-grade gold mineralization [2][3]. - Notable drill results include: - Hole DGR-032: 6.4 g/t gold over 3.30 meters, including 15.10 g/t gold over 1.00 meter in a new high-grade footwall zone at Pearl [5]. - Hole DGR-031: 77.90 g/t gold over 0.50 meters in a second footwall zone at Pearl [5]. Exploration Focus - The Gold Rock Target Area will be a major focus of the 2026 exploration campaign, with a fully funded 32,000-meter program aimed at expanding high-grade mineralization [3][4]. - The company plans to test the Big Master Gold System to further expand high-grade mineralization at Treasure and Barrelman [3]. Management Commentary - CEO Trey Wasser emphasized the potential of the Gold Rock Target Area, highlighting the discovery of multiple stacked structures with near-surface high-grade gold [3]. - President Maura Kolb expressed excitement over the new results, noting the discovery of high-grade mineralization in the footwall of Pearl, similar to previous findings at Jubilee [4]. Upcoming Events - Management will participate in several upcoming conferences, including the Whistler conference and the Metals Investor Forum, to discuss the latest drill results and engage with investors [10][11][12].
Dryden Gold Expands the Gold Rock Camp with High-Grade Discoveries at Mud Lake
Newsfile· 2025-11-25 11:00
Core Insights - Dryden Gold Corp. has successfully expanded the Gold Rock Camp with high-grade gold discoveries at the Mud Lake Target Area, confirming the geological potential for multiple gold-bearing structures [1][3][5] - The exploration program aims to validate the theory of periodicity of deposits in the Gold Rock Camp, with initial results indicating a promising geological setting [3][5] - The company plans to continue developing additional targets in the Gold Rock Camp following the successful step-out drilling at Mud Lake [1][3] Exploration Results - The first pass 3-hole exploration program at Mud Lake revealed significant gold grades, including a quartz vein intersecting as high as 43.10 g/t gold over 0.50 meters [5][8] - Surface sampling indicated a high-grade shear zone with 93.00 g/t gold, suggesting a potential 1-kilometer mineralized footprint similar to the Gold Rock target area [5][9] - The geological interpretation of the Mud Lake footprint is ongoing, with initial findings confirming a flexure in the mineralized trend, which is common in shear zone systems [6][10] Future Plans - The company will analyze data collected from the summer Mud Lake program to plan for permitting and further testing [6][12] - A webinar is scheduled for December 4, 2025, to provide an overview of the 2025 exploration program and details about upcoming initiatives for the 2026 drill program [12] - Dryden Gold aims to leverage its strategic land position in the Dryden District of Northwestern Ontario, which includes historic gold mines and significant exploration potential [16]
Dryden Gold Reports New Gold Discovery at the Hyndman Project High-Grade Channel Sample Assays Leads to a 2026 Drill Program
Newsfile· 2025-10-02 10:00
Core Insights - Dryden Gold Corp. has reported a new gold discovery at the Hyndman project, with assay results showing a high-grade interval of 23.32 g/t gold over 2.80 meters, including 24.79 g/t gold over 1.50 meters and 36.90 g/t gold over 0.70 meters, leading to a positive decision for a drill-test program in 2026 [1][3][8] Exploration Strategy - The advancement of the Hyndman target is one of the four main objectives for the 2025 Exploration Campaign, validating the company's two-pronged exploration strategy [2] - The company is focusing on its flagship brownfields prospect at the Gold Rock Target Area, where drilling has intercepted multiple high-grade parallel structures over a one-kilometer strike [2] - Regional exploration efforts include proving periodicity in the Gold Rock Camp, drill testing the Sherridon Project, and advancing the Hyndman Project to "drill-ready" status through channel sampling [2] Geological Context - The Hyndman project is located in the Kawashegamuk Group, characterized by various lithologies of metasedimentary units and mafic metavolcanic sequences, with a significant diorite intrusion approximately 4-5 km long and 400m wide [6][7] - The mineralization observed at Hyndman is similar to the Goldlund Deposit held by NexGold, with the host rock having 4-5 times more potential strike length than Goldlund [3] Assay Results - The channel sample program at Hyndman yielded significant results, with the highest grade of 36.90 g/t gold over 0.70 meters reported [8] - Other notable results include 24.79 g/t gold over 1.50 meters and 23.32 g/t gold over 2.80 meters [8] Upcoming Events - Management will participate in the 121 Global Online Conference on October 14-15, 2025, to provide updates on the fully funded drill program and exploration plans [9]
Dryden Gold Reports 8.68 g/t Gold over 9.40 Meters at Jubilee
Newsfile· 2025-08-21 10:00
Core Insights - Dryden Gold Corp. is reporting positive results from its ongoing 2025 drill program on the Elora Gold System, particularly from the Jubilee Zone and Jubilee Hanging Wall [1][3] Drill Highlights - Drill hole DGR-25-016 intercepted 8.68 g/t gold over 9.40 meters, including high-grade intercepts of 20.50 g/t over 1.30 meters and 26.40 g/t over 1.40 meters [4][7] - Drill hole DGR-25-013 expanded the Jubilee Zone with 1.54 g/t gold over 10.35 meters, including 6.12 g/t over 1.30 meters [4][7] - The company has identified four gold-bearing hanging wall structures parallel to the Jubilee Zone [7] Jubilee Zone - The geology team is collaborating with experts to refine the controls of the highest-grade mineralization, which appears to be influenced by regional structural intersections [4] - The findings from Jubilee will inform targeting for high-grade zones in other areas of the Gold Rock Camp [4] Jubilee HW Zone - Follow-up drilling has confirmed multiple stacked structures in the hanging wall of the Jubilee Zone, with hole DGR-25-013 showing 3.41 g/t gold over 5.25 meters, including 8.01 g/t over 2.05 meters [5][7] - Additional results from holes DGR-25-013 and DGR-25-014 indicate promising mineralization in the hanging wall area [5] Drill Program Update - The current drilling program includes a focus on the Pearl Zone and Laurentian Mine area, with plans to test expansion targets between Pearl and Laurentian [6] - The company is also set to drill at the Mud Lake target, which has shown surface samples grading up to 24.20 g/t gold [6] Financing Update - Dryden Gold closed a financing of $7.8 million, which includes $5.95 million allocated for 2026 flow-through exploration funds [16] - The 2026 exploration program is expected to commence in October 2025, involving 20,000 meters of drilling [16]
Dryden Gold Extends the Elora Gold System to One Kilometer Strike and Discovers Multiple Stacked Gold-Bearing Structures
Newsfile· 2025-06-19 10:00
Core Viewpoint - Dryden Gold Corp. has announced significant findings from its initial drilling campaigns at the Pearl and Laurentian targets, indicating the extension of the Elora Gold System and the discovery of multiple stacked gold-bearing structures, which may present new exploration opportunities [1][3]. Drilling Results - At the Pearl Target, drill hole DGR-25-007 intersected three gold-bearing zones, with the main zone returning 2.26 g/t gold over 8.80 meters, including higher grades of 7.12 g/t over 2.60 meters and 25.80 g/t over 0.60 meters [4][6]. - Drill hole DGR-25-006 at Pearl also intersected three stacked mineralized structures totaling over 21 meters [6]. - At the Laurentian Target, drill hole DGR-25-001 returned assays of 28.60 g/t gold over 0.50 meters, indicating a similar zone to a previous high-grade discovery at the Jubilee Zone [6][7]. Exploration Strategy - The exploration team plans follow-up drilling at Laurentian to test deeper extensions of the system and to explore the high-grade zones below historical workings [8]. - At Pearl, the focus will be on developing targets to test depth and strike extensions to expand the high-grade zone [8]. Company Overview - Dryden Gold Corp. is focused on discovering high-grade gold mineralization and controls a strategic land position in the Dryden District of Northwestern Ontario, with a history of limited modern exploration [13].