Workflow
High - speed Railway Construction Technology Innovation
icon
Search documents
雄商高铁全线唯一的控制性工程,黄河特大桥全桥贯通
Qi Lu Wan Bao Wang· 2025-05-23 16:02
Core Viewpoint - The construction of the Xiongshan High-Speed Railway, particularly the Yellow River Grand Bridge, is a critical component of China's high-speed rail network, showcasing innovative construction techniques and addressing complex geological challenges [1][4]. Group 1: Project Overview - The Xiongshan High-Speed Railway spans approximately 552 kilometers, connecting Xiong'an Station to Shangqiu Station, with a design speed of 350 km/h [1]. - The Yellow River Grand Bridge is the only control project along the Xiongshan High-Speed Railway, measuring 40.82 kilometers in total length, with the main bridge being 1,600 meters long and utilizing 43,000 tons of steel [4]. Group 2: Construction Techniques - The project employs a "mobile formwork" system, referred to as the "aerial beam factory," which has reduced the construction cycle for each beam from 21 days to 15 days through innovative methods [4][5]. - Advanced technologies such as three-dimensional modeling and intelligent monitoring systems have been integrated to ensure high precision in construction, with errors controlled within millimeters [4][5]. Group 3: Geological Challenges - The construction faced significant challenges due to the complex hydrological conditions of the Yellow River, including high water levels and strong erosion [5]. - Specialized techniques, such as environmentally friendly mud circulation methods, were implemented to address these challenges during the construction of underwater piers [5][6]. Group 4: Project Management and Future Steps - The project team has emphasized continuous project management and personnel support to ensure the successful completion of the construction tasks [6]. - The experience gained from overcoming construction difficulties is expected to enhance the skills and capabilities of the team for future projects [6].