Sustainable and Responsible Mining

Search documents
Endeavour Silver Announces Q2 2025 Financial Results; Earnings Call at 10AM PDT (1PM EDT) Today
GlobeNewswire News Room· 2025-08-13 10:50
Core Viewpoint - Endeavour Silver Corp. reported strong financial and operational results for Q2 2025, showcasing increased silver equivalent production, significant revenue growth, and successful integration of Minera Kolpa into its operations [2][3]. Financial Overview - Silver ounces produced in Q2 2025 reached 1,483,736, a 13% increase from 1,312,572 ounces in Q2 2024. However, gold production decreased by 26% to 7,755 ounces [5][6]. - Revenue from operations was $85.3 million, a 46% increase compared to $58.3 million in Q2 2024, driven by higher sales volumes and realized prices [6][7]. - Mine operating cash flow before working capital changes was $22.9 million, up 21% from $18.9 million in Q2 2024 [6][11]. - The company ended Q2 2025 with a consolidated cash balance of $52.5 million [6]. Production Costs - Cash costs per silver ounce increased by 14% to $15.35 in Q2 2025, while all-in sustaining costs rose by 9% to $25.16 per ounce [5][10]. - Direct operating costs per tonne were $142.00, slightly higher than $140.36 in Q2 2024, influenced by maintenance and the addition of Kolpa [7][9]. Acquisition and Growth - The acquisition of Minera Kolpa was completed on May 1, 2025, which included a $50 million equity financing to fund the cash component of the acquisition [6][12]. - The Terronera project is nearing commercial production, with increased throughput rates reported at the end of July 2025 [6][12]. Earnings and Losses - The company reported a net loss of $20.5 million for Q2 2025, compared to a net loss of $14.0 million in Q2 2024, primarily due to operating losses from the Terronera project [15][13]. - Adjusted net loss was $9.2 million, significantly higher than the adjusted net loss of $1.0 million in Q2 2024 [15][28]. Management Update - Allison Pettit has been promoted to Vice President of Investor Relations, effective August 1, 2025, to enhance the company's investor relations and communications strategies [19][20].
Endeavour Silver Continues to Confirm High-Grade Structures During its 2024/2025 Drill Program at Pitarrilla
GlobeNewswire News Room· 2025-06-03 10:50
Core Insights - Endeavour Silver Corp. reported positive drill results from its Pitarrilla project in Durango, Mexico, indicating high-grade silver, zinc, and lead mineralization, which enhances confidence in upgrading existing mineral resources [1][22]. Drill Results - Significant drill results from the Danna vein include a wide mineralized interval of 7.4 meters with grades of up to 1,127 grams per tonne (gpt) silver, 1.40% lead, and 4.36% zinc, translating to 1,319 gpt silver equivalent (AgEq) over 2.08 meters estimated true width (ETW) [7]. - Drill hole BPU-022 intersected 247 meters of apparent width with 254 gpt AgEq, with true width estimated at approximately 400 meters wide and up to 100 meters high in some areas [10][15]. - The Manto Pitarrilla structure showed high-grade intervals, including 2,680 gpt silver, 24.03% lead, and 18.90% zinc for 3,987 gpt AgEq over 0.60 meters in hole BPU-022 [4][15]. Geological Context - The Pitarrilla deposit consists of three mineralized domains and at least four identified sulphide mineralized veins, with structures extending from below marine sediments through Manto Pitarrilla into upper volcanics [5][6]. - The geological re-logging of historical drill core has improved understanding of the deposit's geology and mineralization controls, focusing on high-grade feeder structures believed to be the main conduits for mineralization [22][23]. Project Overview - The Pitarrilla project is a large undeveloped silver, lead, and zinc project located 160 kilometers north of Durango City, covering 4,752 hectares across five concessions, with significant infrastructure and key permits already in place for underground mining and development [24].
Endeavour Silver Announces Q1 2025 Financial Results; Earnings Call at 10AM PDT (1PM EDT) Today
Globenewswire· 2025-05-13 10:50
Core Viewpoint - Endeavour Silver Corp. reported strong financial and operational results for Q1 2025, driven by higher realized prices for silver and gold, despite a decrease in production volumes [2][4]. Financial Overview - Silver ounces produced decreased by 17% to 1,205,793 ounces compared to Q1 2024, while gold ounces produced fell by 18% to 8,338 ounces [4][10]. - Revenue remained relatively stable at $63.5 million, a slight decrease of 0% from $63.7 million in Q1 2024, despite a 30% drop in silver ounces sold [4][10]. - The realized silver price increased by 36% to $31.99 per ounce, and the realized gold price rose by 37% to $2,903 per ounce [4][10]. Production and Operating Costs - Cash costs per silver ounce rose by 20% to $15.89, while all-in sustaining costs increased by 14% to $24.48 per ounce [4][9]. - Direct operating costs per tonne increased by 6% to $142.72, attributed to lower throughput [8][10]. Earnings and Cash Flow - The company reported a net loss of $32.9 million for the quarter, a significant increase from a loss of $1.2 million in Q1 2024 [6][13]. - Mine operating cash flow before working capital changes was $8.3 million, down 18% from the previous year [5][10]. Liquidity and Investments - Endeavour maintained a strong liquidity position with cash of $64.7 million and working capital of $14.8 million [5][10]. - The company completed the acquisition of Minera Kolpa and closed a $50 million equity financing to fund this acquisition [5][10]. Future Outlook - The company is well-positioned for sustainable growth with the addition of the Kolpa project and the upcoming Terronera project [2][5].