水利工程管理
Search documents
“七下八上”防汛关键期,水利部门积极采取有力措施全力保障镇江主城区度汛安全
Zhen Jiang Ri Bao· 2025-07-23 23:51
Core Viewpoint - The city’s water management department is implementing multiple measures to ensure safety during the critical flood prevention period known as "July down, August up" [1] Group 1: Inspection and Preparedness - The department emphasizes early detection and resolution of issues through comprehensive inspections and updates to flood prevention plans [2] - A total of 15.3 kilometers of the Yangtze River flood wall and 20.27 kilometers of three major urban rivers have been inspected [2] - A flood prevention team has been established, with weekly inspections and special checks after rainfall to ensure readiness [2] Group 2: Emergency Response and Training - The water management department is conducting emergency drills to ensure orderly operation during floods, simulating scenarios of power failures during heavy rainfall [3] - Training sessions are being held for staff to enhance their emergency response capabilities and operational skills [3] Group 3: Technological Integration - The department is integrating technology into flood prevention efforts, creating a collaborative system of human and technological defenses [4] - Real-time monitoring systems have been established for flood conditions, allowing for efficient decision-making during emergencies [4] - Drone technology is being utilized for comprehensive river inspections, improving efficiency and coverage [4] Group 4: Ongoing Management and Coordination - The department will continue to strengthen leadership and monitoring systems, ensuring 24-hour vigilance and response to extreme weather [5] - There is a focus on balancing flood prevention with ecological management to ensure both safety and environmental quality [5]
广东强化汛期水利工程巡查机制 多管齐下筑牢安全防线
Shui Li Bu Wang Zhan· 2025-06-06 08:39
Group 1 - The core viewpoint of the article is the implementation of a long-term mechanism for flood season water conservancy project inspections to ensure the safe operation of water conservancy projects in Guangdong Province [1][2][3] Group 2 - The notification specifies that water conservancy project inspections will be categorized into four types: daily inspections, pre-disaster inspections, in-disaster inspections, and post-disaster inspections [2] - Daily inspections for reservoirs (hydropower stations) must occur at least once a day, while levee and sluice inspections should occur at least once a week [2] - The notification emphasizes the use of advanced technologies such as satellite remote sensing, laser radar, unmanned boats, and drones to innovate and enhance the inspection system [2] Group 3 - A closed-loop management process is established for identifying and rectifying issues, requiring general issues to be resolved within five working days and immediate emergency measures for major issues [3] - The notification stresses the importance of timely detection and elimination of hazards to ensure the normal operation of water conservancy projects and safeguard public safety [3]