Uranium Exploration
Search documents
Nuclear Fuels Provides Closing Update on Transaction with Premier American Uranium Inc.
Prnewswire· 2025-08-29 20:15
Company Overview - Nuclear Fuels Inc. is a uranium exploration company focused on advancing early-stage, district-scale ISR amenable uranium projects towards production in the U.S. [2] - The company has consolidated the Kaycee district under single-company control for the first time since the early 1980s, positioning itself for significant growth supported by strong government backing [2] - The ongoing 2025 drill program follows successful drilling in 2023 and 2024, aiming to expand on historic resources across a 35-mile trend with over 430 miles of mapped roll-fronts defined by 3,800 drill holes [2] - A strategic relationship with enCore Energy Corp. provides a "pathway to production," with enCore holding an equity interest and the right to back-in to 51% ownership in the flagship Kaycee Project located in Wyoming's Powder River Basin [2] Recent Developments - The company announced an extension of the closing date for the statutory plan of arrangement with Premier American Uranium Inc. to on or before September 10, 2025, due to delays in receiving approval from the TSX Venture Exchange [1]
Foremost Clean Energy Announces Positive Radon Survey Results on its Wolverine Uranium Property, Athabasca Basin, Saskatchewan
Globenewswire· 2025-08-27 13:00
Core Insights - Foremost Clean Energy Ltd. has announced positive results from a radon survey at the Wolverine Uranium Property, indicating potential subsurface uranium presence [1][2][4] - The survey identified elevated radon anomalies, suggesting a favorable geological setting for high-grade uranium mineralization [2][4][5] Radon Survey Results - A total of 893 data points were collected during the radon survey, which included both radon flux monitoring and a radon-in-water component [1] - Two significant radon anomalies were detected: one extending one kilometer northeast and another in the northeast portion of the grid, both remaining open along strike [4][8] - The radon flux values were ranked relative to the highest value collected, highlighting a pronounced NNE-trending radon anomaly that correlates with an interpreted structural feature [5] Geological Context - The Wolverine Property consists of three mineral claims totaling 12,444 acres (5,036 hectares) and has a history of uranium mineralization identified through previous drilling [6] - Historical drilling results include a notable intersection of 2,087 ppm U over 0.1 meters, indicating the property's potential for uranium exploration [6] Future Plans - The company plans to integrate the radon survey results with historical geophysical and drill data to refine high-priority drill targets for future exploration [2][9] - The technical team is focused on advancing the understanding of the Wolverine site to unlock its mineral potential systematically [2]
Standard Uranium Generates New High-Priority Uranium Targets at Flagship Davidson River Project Following Exosphere Multiphysics Surveys
Newsfile· 2025-08-21 11:00
Core Insights - Standard Uranium Ltd. has successfully completed ExoSphere Multiphysics surveys at its flagship Davidson River Project, identifying multiple high-priority uranium targets in the southwest Athabasca Basin [1][3][5] Exploration and Survey Results - The surveys utilized combined 3D Ambient Noise Tomography (ANT) and Horizontal-to-Vertical Spectral Ratio (HVSR) models, generating critical subsurface information for ongoing exploration [5][7] - Distinct gravity-low anomalies indicating potential hydrothermal alteration zones have been identified across the Warrior, Bronco, and Thunderbird corridors, coinciding with known electromagnetic conductors and extrapolated basement faults [5][8] - The new datasets from the Multiphysics surveys provide invaluable targeting information, enhancing the understanding of the geological framework in the area [3][7] Upcoming Drilling Program - A four-to-six-week diamond drilling program is scheduled to commence in early September 2025, marking the first drilling campaign since 2022 [5][10] - Drill targets will be prioritized based on previous drilling results, new ANT + HVSR + Gravity anomalies, and machine learning SmartMatch targets [11] Project Overview - The Davidson River Project consists of 10 contiguous mineral dispositions covering approximately 30,737 hectares and is located 25 to 30 km west of significant uranium deposits [14][27] - The project hosts four main conductive corridors associated with graphitic-sulphidic structures, which are commonly linked to high-grade uranium systems [15][16] Financial Update - The company is moving forward with a non-brokered private placement to raise gross proceeds of up to C$3,500,000, with an initial tranche expected to be completed shortly [19][20]
Baselode Announces Approval of Plan of Arrangement by Forum Shareholders, Updates on Merger
Newsfile· 2025-08-19 21:14
Core Viewpoint - Baselode Energy Corp. has announced the approval of a plan of arrangement by Forum Energy Metals shareholders, allowing Baselode to acquire all outstanding shares of Forum at a specified exchange ratio [1][2]. Group 1: Shareholder Approval - 97.57% of Forum shareholders voted in favor of the arrangement during the special meeting held on August 19, 2025 [2]. - The arrangement required at least two-thirds (66⅔%) approval from the votes cast by Forum shareholders present or represented by proxy [2]. Group 2: Next Steps - Forum will seek a final order from the Superior Court of British Columbia on August 22, 2025, to approve the arrangement [3]. - Completion of the arrangement is expected shortly after receiving the final order [3]. Group 3: Baselode's Future Plans - Baselode's Annual General and Special Meeting is scheduled for September 16, 2025, where it will seek shareholder approval to change its name to Geiger Energy Corporation [4]. - The company will also seek approval for a potential consolidation of its common shares on a basis of one post-consolidation share for every five outstanding pre-consolidation shares [4]. Group 4: Geiger Energy Metals - Geiger Energy Metals will focus on uranium exploration, particularly developing its 100%-owned Aberdeen and Hook projects located in Nunavut and Saskatchewan [5]. - Leadership will include Dr. Rebecca Hunter as CEO and Stephen Stewart as Chairman, with additional board appointments from Forum's current directors [6]. Group 5: Company Background - Forum Energy Metals is focused on discovering high-grade uranium deposits in the Athabasca Basin and Thelon Basin [7]. - Baselode controls approximately 226,128 hectares for exploration in the Athabasca Basin area, free of option agreements or underlying royalties [9]. Group 6: Exploration Focus - Baselode discovered the ACKIO uranium prospect, which measures over 375 meters along strike and is comprised of at least nine separate uranium pods [10]. - The exploration thesis emphasizes discovering near-surface, basement-hosted, high-grade uranium orebodies outside the Athabasca Basin, utilizing innovative geophysical methods [11].
Nuclear Fuels Announces Final Court Approval of Arrangement with Premier American Uranium
Prnewswire· 2025-08-19 11:00
Core Viewpoint - Nuclear Fuels Inc. is progressing with a statutory plan of arrangement with Premier American Uranium Inc., which has received final court approval, targeting completion by August 25, 2025 [1][2]. Group 1: Plan of Arrangement Details - The Supreme Court of British Columbia approved the Plan of Arrangement on August 18, 2025, allowing Premier American Uranium to acquire all outstanding common shares of Nuclear Fuels [1][3]. - Completion of the arrangement is contingent upon approval from the TSX Venture Exchange and other customary closing conditions [2]. - Following the arrangement, shares of Premier American Uranium will continue trading on the TSX Venture Exchange, while Nuclear Fuels will be de-listed from the Canadian Securities Exchange [4]. Group 2: Financial Advisory and Compensation - Nuclear Fuels engaged Canaccord Genuity Corp. as a financial advisor for the arrangement, compensating them with 648,414 common shares at a deemed price of $0.347 per share [5]. Group 3: Company Overview - Nuclear Fuels Inc. is focused on uranium exploration, advancing ISR amenable uranium projects in the U.S., and is well-positioned for growth due to strong government support [6]. - The company has consolidated the Kaycee district under single control for the first time since the early 1980s and is planning a 2025 drill program to expand historic resources across a 35-mile trend [6].
Nuclear Fuels Shareholders Approve Arrangement with Premier American Uranium
Globenewswire· 2025-08-13 23:16
Core Points - Nuclear Fuels Inc. and Premier American Uranium Inc. announced the approval of a statutory plan of arrangement by 95.08% of Nuclear Fuels shareholders [2][5] - Each Nuclear Fuels shareholder will receive 0.33 common shares of Premier American Uranium for each share held [3] - The completion of the plan is subject to final court approval and other customary closing conditions, with a target completion date around August 25, 2025 [4] Company Overview - Nuclear Fuels Inc. is focused on uranium exploration, advancing early-stage projects in the U.S. and is well-positioned for growth due to strong government support [6] - The company has consolidated the Kaycee district and is conducting a drill program to expand historic resources across a 35-mile trend [6] - Premier American Uranium Inc. aims to consolidate and develop uranium projects in the U.S., enhancing domestic energy security and supporting clean energy transitions [7] - Premier holds extensive land in key uranium-producing regions and is advancing its portfolio through active work programs [8]
F4 and Stearman to Explore Drill-Ready Murphy Lake
Newsfile· 2025-07-29 18:15
Core Viewpoint - F4 Uranium Corp. has entered into an exclusive option agreement with Stearman Resources Inc. to allow Stearman to acquire up to a 70% interest in the Murphy Lake uranium property in Saskatchewan, marking a strategic partnership aimed at advancing exploration and development of the property [1][2][3]. Agreement Details - Stearman will make a non-refundable cash payment of $50,000 on July 28, 2025, as the initial payment [2]. - Stearman has the option to acquire a 50% interest in the property by paying a total of $750,000 over 24 months, with specific payment milestones [2]. - Stearman is required to fund $10,000,000 in exploration expenditures over 42 months, with scheduled expenditures of $1,500,000 at 12 and 24 months, and $7,000,000 at 42 months [2]. - Stearman must complete equity financings to raise at least $3,000,000 within six months, after which it will issue shares to F4 equal to 9.9% of its total outstanding shares [2]. - Following the initial option, Stearman can acquire an additional 20% interest in the property, bringing its total interest to 70% [2][4]. Property Overview - The Murphy Lake Property spans 609 hectares and is located in the northeastern Athabasca Basin, near significant uranium deposits [6]. - The property is strategically positioned 5 km south of ISOEnergy's Hurricane Uranium Deposit and 4 km east of Cameco's La Rocque Lake Uranium Zone [1][6]. - Previous drilling at the property has shown promising results, including a peak scintillometer reading of 2,300 cps and assay results of 0.065% U3O8 over 2.5m [6]. Company Background - F4 Uranium Corp. is focused on uranium exploration in the Athabasca Basin, with a portfolio of 17 wholly owned properties totaling approximately 157,000 hectares [9]. - The company was spun out of F3 Uranium in 2024 and is led by a management team with a history of successful uranium discoveries [9].
DevEx Resources (DEV) Conference Transcript
2025-07-23 07:35
Summary of DevEx Resources Conference Call - July 23, 2025 Company Overview - **Company**: DevEx Resources (DEV) - **Industry**: Uranium Exploration - **Location**: Northern Territory, Australia - **Market Position**: One of the few ASX listed uranium explorers with a strong focus on the uranium market [2][3] Key Points Exploration and Assets - **Exploration Portfolio**: DevEx has been exploring in the Northern Territory for several years, focusing on uranium assets [2][3] - **Capital Structure**: The company has a market capitalization of approximately $36 million and $7.8 million in cash reserves, indicating strong funding for exploration activities [7] - **Flagship Projects**: Key projects include the Narbelec project in the MacArthur Basin and the Murphy West project [11][19] - **Land Tenure**: DevEx has assembled over 16,000 square kilometers of land tenure in the MacArthur Basin, which has seen minimal exploration in recent years [13] Market Dynamics - **Uranium Market Outlook**: The company is optimistic about the uranium market due to a projected supply-demand gap expected to exceed 200% by 2040, leading to higher prices [9] - **Current Prices**: Spot prices for uranium have fluctuated, recently around $73 per pound, while term prices are approximately $83 per pound [8] - **Global Demand**: There are currently about 60 nuclear reactors under construction worldwide, with significant plans for expansion in countries like China [10] Exploration Strategy - **Target Identification**: DevEx is focused on finding high-grade, unconformity-style uranium deposits, similar to those found in the Athabasca and MacArthur Basins [12][17] - **Recent Developments**: The company has identified new targets based on radon gas anomalies and received a grant of $160,000 from the Northern Territory government to co-fund drilling for these targets [17][18] - **Adjacent Projects**: The company is exploring areas near the Angulari deposit owned by Deep Yellow and is conducting systematic exploration at the Murphy West project [19] Management and Shareholding - **Leadership**: The company is led by Chairman Tim Goyter, who holds a 19.9% stake, and Managing Director Todd Ross, who has a background in banking and exploration [4][5] - **Team Expertise**: The management team possesses significant uranium expertise, which is crucial for executing exploration strategies [3][6] Additional Insights - **Historical Context**: The Narbelec mine was historically Australia's highest-grade uranium mine, producing 24 million pounds at nearly 2% uranium [15] - **Exploration Challenges**: The company has shifted focus to identify potential deposits that may be covered by geological formations, which requires advanced exploration techniques [16] This summary encapsulates the key aspects of DevEx Resources' conference call, highlighting the company's strategic positioning within the uranium exploration industry and its proactive approach to capitalizing on market opportunities.
Vanguard Mining Site Visit and Core Review Preparation Underway at Yuty Prometeo Project, Paraguay
Thenewswire· 2025-07-22 07:05
Company Overview - Vanguard Mining Corp. is preparing for site visits by its technical team for core review and analysis in anticipation of a maiden NI 43-101 Technical Report on the Yuty Prometeo Uranium Project in Paraguay [1][3] - The Yuty Prometeo Project consists of four concessions covering approximately 90,000 hectares (222,395 acres) in the uranium-rich Paraná Basin [2][4] Industry Context - Uranium prices have increased by approximately 33% over the past six months, with the current spot price at US$78.50 per pound, indicating renewed momentum in the sector driven by global demand for clean energy [2][3] - The Paraná Basin is known for its uranium deposits, including the adjacent Uranium Energy Corp.'s Yuty Deposit, which has an indicated resource of 8.96 million pounds of U₃O₈ [2][14] Project Details - The Yuty Prometeo Project is strategically located adjacent to a defined multi-million-pound uranium deposit, benefiting from strong geological fundamentals and excellent infrastructure access [3][4] - Historical records indicate uranium values ranging from 0.05% to 0.10% U₃O₈ from 28 drill holes on the Prometeo Concession, although these results are considered historical and have not been verified [6][14] Exploration and Development Plans - The technical team's initial site visit will include core logging, sampling, and preliminary analysis to validate historical data and support NI 43-101 reporting [3][9] - The company aims to apply modern exploration techniques to unlock the potential of the Yuty Prometeo Project, which is viewed as a significant uranium asset in South America [4][15] Financial Activities - Vanguard Mining Corp. plans to conduct a non-brokered private placement of up to 12,830,000 units at a price of $0.15 per unit, aiming for gross proceeds of up to $1,924,500 [16][21] - The proceeds from the offering will be used for exploration programs on its mineral properties and general working capital [21][22]
Skyharbour Partner Company Terra Clean Energy Announces Immediate Follow-Up Summer Drill Program on the Back of Drill Results from Winter Program at South Falcon East Uranium Project
Globenewswire· 2025-07-21 12:00
Core Viewpoint - Skyharbour Resources Ltd. and its partner Terra Clean Energy Corp. have reported encouraging results from the Winter 2025 drill program at the South Falcon East Uranium Project, indicating potential for higher-grade uranium discoveries in the area [1][6][7]. Group 1: Drill Program Results - The Winter 2025 drill program included seven diamond drill holes totaling 1,927 meters at the Fraser Lakes B Uranium Deposit, with 682 samples submitted for geochemical analysis [2][3]. - Significant mineralization was found in several drill holes, with hole SF0065 returning 18.1 meters at 0.03% U3O8, including a subinterval of 0.12% U3O8 over 1.6 meters [3]. - The northernmost hole, SF0067, returned 3.87 meters at 0.05% U3O8, with the best sample showing 0.17% U3O8 over 0.5 meters, indicating strong mineralization potential [3][4]. Group 2: Comparison with Previous Results - Lab results from the Winter 2025 program typically showed wider intervals of mineralization with higher grades compared to previous downhole gamma logging results, with variations averaging between +5% to +30% higher [4][5]. Group 3: Upcoming Drill Program - Terra plans a follow-up drill program in Summer 2025, consisting of approximately 2,500 meters of drilling to further explore areas identified in the Winter program [8][10]. - The upcoming program will target a high-priority area where multiple geological indicators for higher-grade uranium mineralization intersect [9][11]. Group 4: Project Overview - The South Falcon East Project covers approximately 12,464 hectares and is located 18 kilometers outside the Athabasca Basin, hosting the Fraser Lakes B Uranium-Thorium Deposit with a historical inferred resource of 6.9 million pounds U₃O₈ at an average grade of 0.03% U₃O₈ [12][13].