Workflow
《石家庄地铁 4 号线南王站深基坑施工安全与民生保障评估报告》
icon
Search documents
“南王安澜”实践:专业实践与思政教育的深度融合
Yang Shi Wang· 2025-07-25 03:52
Core Viewpoint - The "Nanwang Anlan" social practice team from Hebei University of Geosciences focuses on deep foundation pit construction safety and its impact on residents' daily lives during their summer practice in Shijiazhuang's Metro Line 4 construction site [1][6]. Group 1: Construction Safety - Deep foundation pit construction is identified as a high-risk area in subway construction, directly affecting both engineering quality and the safety of surrounding residents [3]. - The team utilized professional equipment such as laser rangefinders and total stations to measure key indicators like support structure stability and nearby building settlement, discovering localized micro-deformation on the northwest side of the pit [3]. - The team promptly recommended increasing the frequency of support axial force monitoring and adding tilt monitoring points, which the construction party adopted to enhance safety measures [3]. Group 2: Technological Innovation - The team proposed an innovative "IoT + AI" smart monitoring solution that upgrades data collection through the installation of micro smart sensors and incorporates an AI analysis platform for intelligent data assessment [5]. - This approach not only reduces construction costs but also significantly enhances safety warning capabilities, paving the way for smart construction site development [5]. Group 3: Community Impact - The team conducted a special survey on the impact of construction on local residents, finding that construction barriers significantly increased congestion during peak hours [6]. - They collaborated with traffic management departments to propose solutions such as optimizing temporary lane divisions and dynamically adjusting traffic light timings to alleviate traffic pressure [6]. - To address residents' complaints about nighttime construction noise, the team set up multiple monitoring points to record decibel levels over 72 hours and gathered data from 129 effective questionnaires, leading to adjustments in work hours and the installation of sound barriers [6]. Group 4: Educational Value - The team recognized the close relationship between professional learning and social responsibility, completing a report that provided scientific evidence for construction safety and served as a practical example of educational integration [8]. - The practice reflects the university's "Red Shine Double Land" party-building project, demonstrating the integration of professional practice with ideological education and showcasing the commitment of the youth to national development [8].