Workflow
七七三解堵防砂工艺体系
icon
Search documents
济北采油管理区三级治理体系解“堵”
Qi Lu Wan Bao Wang· 2025-10-03 02:30
Core Insights - The "773" blockage removal and sand prevention technology developed by Shengli Oilfield's Luming Company has shown significant results in the application at Qu 9-斜259 and Qu 9-斜257 wells, providing replicable experience for similar oil reservoir development [1][2] - The technology addresses seven types of blockage issues, including drilling mud pollution risks and sand-carrying liquid damage, through systematic analysis and collaborative efforts [1] - The "773" technology employs a composite of seven technical measures, creating a three-level governance system of "dredging, stabilization, and prevention" [1] Technical Details - The technology integrates three processes into one, significantly reducing the operation cycle by 20% and saving operational costs by 30,000 yuan per well, enhancing operational efficiency and economic viability [1] - After applying the technology at Qu 9-斜259, the well pressure decreased from 14.5 MPa to 9.3 MPa, and the daily water injection increased from zero to 20 cubic meters [1] - The daily oil production at Qu 9-斜242 increased from 3.5 tons to 4 tons, with a reduction in water cut by 4.4 percentage points and a rise in dynamic liquid level by 120 meters [1] Broader Implications - The "773" technology has achieved key breakthroughs in multiple rounds of well sand prevention and protection of water-sensitive and rapid-sensitive oil layers, forming a comprehensive technical system [2] - Preliminary estimates suggest that large-scale application of this technology could reduce the frequency of measures by over 20%, effectively lowering development costs while maximizing production capacity [2] - The complete technical specifications have been established, and the technology is being promoted across different development units in the Jibei Oil Production Management Area, demonstrating significant implications for enhancing oil recovery rates [2]