Workflow
低压发电车无线同期并网技术
icon
Search documents
江苏扬中:智能化技术解锁不停电作业新模式
Xin Hua She· 2025-10-13 14:34
Core Insights - The article highlights the successful implementation of wireless synchronous grid connection technology by the State Grid Yangzhong Power Supply Company, which significantly reduces the time required for transformer maintenance operations [1] Group 1: Technology Implementation - The wireless synchronous grid connection technology allows for transformer maintenance to be completed in just 15 minutes, compared to the traditional method which takes an average of 30 minutes for cable laying and recovery [1] - Traditional synchronous grid connection requires the laying of two sets of cables, which adds complexity and time to the operation [1] Group 2: Operational Efficiency - The new technology eliminates the need for cable laying, allowing workers to connect the power supply vehicle seamlessly after data calibration with a self-developed terminal [1] - The use of power supply vehicles for planned maintenance and emergency repairs has become a critical aspect of the company's operations, enhancing the reliability of power supply [1] Group 3: Future Developments - The State Grid Yangzhong Power Supply Company plans to accelerate the promotion and application of intelligent technologies to further improve power supply reliability [1]