康新高速
Search documents
风雪折多山
Xin Hua She· 2026-02-13 02:38
Core Viewpoint - The construction of the Duzha Mountain Tunnel is a critical project aimed at improving transportation safety and efficiency in the Sichuan-Ganzi region, significantly reducing travel time across the challenging terrain of the Duzha Mountain [4][9]. Group 1: Project Overview - The Duzha Mountain Tunnel is part of the Sichuan-Tibet corridor and is considered a key engineering project, with multiple tunnels being constructed simultaneously in the area [2][4]. - The tunnel construction began in 2018 and is expected to be completed in approximately two years, with current progress at nearly 70% for the National Highway 318 section and about half for the Kangxin Expressway section [9]. - Once completed, the travel time over Duzha Mountain will be reduced from 30 minutes to approximately 8 minutes, enhancing emergency response capabilities and promoting economic development [4][9]. Group 2: Challenges and Conditions - The geological conditions of Duzha Mountain are extremely complex, with the presence of multiple geological fault zones leading to challenges such as mud bursts and water inflow during construction [5][9]. - The harsh weather conditions, including heavy snowfall and low temperatures, complicate the construction process, with workers facing high-altitude sickness and difficult working environments [6][8]. - The construction site has seen over a thousand workers in the past year due to the challenging conditions, with a focus on ensuring timely payment and worker welfare [6][8]. Group 3: Economic and Social Impact - The Duzha Mountain region has seen a significant increase in traffic, with daily vehicle flow rising from approximately 2,000 in 2020 to about 20,000 recently, indicating a growing interest in tourism and economic activity [9][12]. - The local economy is benefiting from the construction projects, with the Ganzi region's GDP per capita increasing from about 15,000 yuan in 2012 to over 50,000 yuan in 2024 [12]. - The development of infrastructure, including the Duzha Mountain Tunnel, is expected to facilitate better access to the region, enhancing the quality of life for residents and promoting tourism [12][13].
新春走基层·走笔|风雪折多山
Xin Hua She· 2026-02-12 15:35
Core Viewpoint - The construction of the Zheduo Mountain Tunnel is a significant engineering project aimed at improving transportation in the region, enhancing safety, and promoting economic development, despite facing challenging geological conditions and severe weather [4][5][8]. Group 1: Project Overview - The Zheduo Mountain Tunnel is a key project in the Sichuan-Tibet corridor, with construction ongoing since 2018, and it is expected to significantly reduce travel time across the mountain [2][4]. - The tunnel will allow for a journey that currently takes half an hour to be reduced to approximately 8 minutes once completed, enhancing traffic safety and emergency response capabilities [4][8]. Group 2: Geological and Environmental Challenges - The geological conditions in Zheduo Mountain are complex, with multiple geological fault lines and high ground stress, leading to frequent issues such as mud bursts and water inflow during construction [5][6]. - The area experiences severe weather, including heavy snowfall and icy conditions, which complicates both travel and construction efforts [3][4]. Group 3: Economic and Social Impact - The completion of the tunnel is expected to facilitate better access to the region, promoting tourism and economic growth, as evidenced by the increase in daily traffic from about 2,000 vehicles in 2020 to approximately 20,000 vehicles recently [8][11]. - The local economy, particularly in areas like Xin Du Qiao Town, has seen significant growth, with the hospitality industry flourishing, indicating a positive trend in local development [11]. Group 4: Workforce and Employment - Workers involved in the tunnel construction are reported to earn an average monthly salary of over 10,000 yuan, with additional benefits such as health insurance and regular pay, contributing to job satisfaction and retention [7][8]. - The project has attracted a large workforce, with over a thousand workers reported to have been involved in the past year, highlighting the demand for labor in challenging conditions [6][7].