新一代双层涂覆314Ah磷酸铁锂电芯

Search documents
400MW/1600MWh!山西最大构网型独立共享储能电站开工
中关村储能产业技术联盟· 2025-07-08 09:08
Core Viewpoint - The construction of the 400MW/1600MWh independent shared energy storage station by Ganfeng Group in Shanxi is a significant step towards enhancing local renewable energy consumption and stabilizing the power grid [1][2]. Investment and Financial Summary - The total investment for the project is 2 billion yuan, with an expected annual revenue of 300 million yuan [2]. - Upon completion, the project is projected to reduce carbon dioxide emissions by over 500,000 tons annually, equivalent to the carbon sequestration benefits of approximately 2,800 hectares of forest [2]. Technology and Innovation - The project utilizes Ganfeng's advanced 5MWh energy storage container system, featuring domestically developed high-cycle, long-life next-generation dual-layer coated 314Ah lithium iron phosphate battery cells [2]. - The energy storage system incorporates Ganfeng's proprietary liquid cooling and fully automated linkage fire protection system [2]. Policy and Market Context - The project aligns with the recent policy developments in Shanxi, including the 136th document which outlines pricing mechanisms for energy storage and the focus on new power system construction [4].