旱雪滑道
Search documents
上亿根“金针菇”铺就全国最长中级旱雪滑道
Xin Lang Cai Jing· 2026-02-08 19:33
Core Insights - The project features the longest intermediate dry snow slope in China, measuring 440 meters, and is located at the Chengdu Pengzhou National Fitness Center [4][5]. - The dry snow slope is constructed using a material nicknamed "golden needle mushroom," which allows for a 95% simulation of real snow sliding experience [5][6]. - The facility includes a total dry snow experience area of 27,500 square meters, making it the largest in Southwest China, catering to various needs from beginner training to professional practice [5]. Group 1 - The intermediate dry snow slope is designed for amateur skiers with some experience and professional athletes, featuring a maximum slope of 14 degrees and a straight length of 150 meters [7]. - Safety measures include a buffer zone to prevent skiers from flying off the slope, adhering to national standards [7]. - The project is nearing completion, with expectations to be delivered by mid-year, while final landscaping work is still ongoing [7]. Group 2 - The construction involves over one billion "golden needle mushrooms" as part of the slope material [6]. - The design of the "golden needle mushroom" material provides better support and resilience compared to previous dry snow technologies, enhancing the skiing experience [7]. - The facility aims to provide year-round skiing opportunities for local residents and high-quality training environments for professionals [5].
全国最长中级旱雪滑道来了
Xin Lang Cai Jing· 2026-01-05 20:49
Group 1 - The project is nearing completion with a construction progress of 90%, expected to be finished before the Spring Festival in 2026 [5][8] - The facility includes the longest intermediate dry snow slide in the country at 440 meters, along with a 130-meter beginner slide [3][6] - The design integrates sports and leisure, featuring a multi-functional complex for fitness, training, and cultural exchange [6][7] Group 2 - The construction includes a swimming pool of approximately 4,700 square meters, 13 indoor badminton courts, 3 indoor basketball courts, and 4 outdoor tennis courts [7] - The main structure is completed at 100%, with various other components such as curtain wall and mechanical installations at 95% and 90% completion respectively [7] - The project is actively progressing in its marketing efforts, with plans for the sports venues to open throughout 2026 [9]