梅帕塘水库
Search documents
西藏在建投资最大中型水库大坝顺利封顶
Xin Hua She· 2025-09-28 18:19
Core Viewpoint - The completion of the dam for the Meipatang Reservoir project in Tibet marks a significant milestone in the construction of one of the largest medium-sized water conservancy projects in the region, with a total investment of 1.435 billion yuan [1] Group 1: Project Overview - The Meipatang Reservoir is located in the Zaqi River midstream in Baqing County, Naqu City, Tibet, with an average elevation of 4,100 meters [1] - The total storage capacity of the reservoir is 24.1 million cubic meters, with a dam length of 539 meters and a maximum height of 55 meters [1] - It is the largest single investment water conservancy project in Naqu City and the largest ongoing investment project in Tibet [1] Group 2: Construction Challenges - The construction faces multiple challenges due to high altitude, low air pressure, and significant temperature variations [1] - To ensure quality and durability, the dam employs a mixed design of roller-compacted concrete gravity dam and geotextile membrane gravel dam, enhancing its impermeability, frost resistance, and corrosion resistance [1] - The project team has conducted relevant process experiments to analyze parameters such as layer thickness and compaction frequency to ensure construction quality [1] Group 3: Project Impact - The Meipatang Reservoir is expected to be completed by June 2026 and will meet the irrigation needs of 44,400 acres of grassland along the downstream riverbanks [1] - It will address the urban and rural water supply needs of approximately 53,100 people in Baqing County and Suoxian [1] - The project plays a crucial role in promoting high-quality economic and social development, advancing rural revitalization, and improving the ecological environment in the region [1]