Workflow
绿电园区配套新能源项目
icon
Search documents
居全国第4!宁夏储能装机规模达541万千瓦
Core Viewpoint - The development of the Ningxia Green Power Park is progressing with significant investments and infrastructure improvements aimed at enhancing renewable energy capacity and grid integration [1][3]. Group 1: Infrastructure Development - Ningxia has completed deep adjustment modifications on 54 coal power units, achieving an average peak shaving depth of 30.22% and a minimum peak shaving depth of 18%, with a total peak shaving capacity of 2,038 MW [1]. - The new energy storage capacity in Ningxia has reached 541 MW, ranking fourth in the country, with ongoing construction of a 1,000 MW pumped storage power station at Niushou Mountain [1][3]. - The State Grid Ningxia Electric Power Company plans to invest CNY 6.556 billion to complete the construction of several 750 kV projects to meet the power supply needs of the green power park [3]. Group 2: Renewable Energy Projects - A total of 1,376 MW of renewable energy projects have been included in the annual development plan, with eight projects totaling 684 MW already approved for grid connection [3]. - The Zhongwei Cloud Base 500 MW photovoltaic project has already been connected to the grid as of April, with plans to connect a total of 971 MW by the end of 2025 and complete all connections by June 2026 [3].