货物列车运输服务
Search documents
2026年春运启动 国铁集团郑州局计划增开临客356列
Zhong Guo Xin Wen Wang· 2026-02-02 06:00
Core Viewpoint - The China Railway Zhengzhou Group Co., Ltd. has officially launched the 2026 Spring Festival travel season, expecting to send 24.43 million passengers over 40 days, with a significant increase in train services to accommodate the anticipated passenger flow [1][2]. Group 1: Passenger Transportation - The Zhengzhou Railway Group anticipates sending 11.42 million direct passengers, a year-on-year increase of 3.78%, and 13.01 million local passengers, up 2.95% [1]. - The peak travel day before the Spring Festival is expected on February 14, while the first peak after the festival is projected for February 24, with a second peak on March 7, where the maximum daily passenger volume could reach 964,000, representing a 15.4% increase compared to the peak day of the 2025 Spring Festival travel season [1][2]. Group 2: Train Operations - During the Spring Festival travel period, the Zhengzhou Railway Group plans to operate 1,781 passenger trains, including 1,425 regular trains and 356 temporary trains, marking an increase of 127 trains compared to the 2025 Spring Festival [2]. - The company is optimizing train schedules, including high-speed trains to major cities like Beijing, Shanghai, and Guangzhou, and is also introducing 63 night trains to enhance travel efficiency and meet diverse passenger needs [2]. Group 3: Freight Transportation - The Zhengzhou Railway Group is coordinating freight transportation to ensure the delivery of essential goods, including food and supplies for the Spring Festival, while optimizing capacity and scheduling for freight trains [3]. - The company is committed to maintaining a stable supply of coal for power plants, ensuring that coal reserves remain above 20 days, thereby supporting the community during winter [3].
沈铁1月26日起调图 买票注意
Xin Lang Cai Jing· 2026-01-18 23:37
Core Points - The new train operation schedule will be implemented nationwide starting from January 26, increasing the number of passenger trains to 1,088 and freight trains to 2,439, enhancing transportation capacity for regional economic development [2][3] Group 1: Passenger Train Adjustments - The new schedule will utilize the capabilities of the Shenyang-Jia high-speed railway, adding 2.5 pairs of daily trains and 4 pairs of peak trains from Changbai Mountain to Beijing and Shenyang [2] - The number of trains operating on the Shenyang-Jia high-speed railway will reach 34.5 pairs, with 6 pairs heading towards Beijing and 3 pairs towards Harbin, supporting the high-quality development of the ice and snow tourism economy along the railway [2] - The travel time from Changchun to Shanghai will be reduced to 9 hours and 22 minutes, a decrease of 2 hours and 5 minutes, by optimizing the operation of the G98/9 and G100/97 high-speed trains [3] Group 2: Freight Train Enhancements - The new schedule includes the addition of a rapid multimodal freight train from Changchun North to Wulanchabu, enhancing the transportation capacity for key materials such as coal, grain, and iron ore [4] - The optimization of freight structure will also see the introduction of two intercity freight trains from Sanjianfang to Jixi, improving logistics efficiency [4] Group 3: Train Quality Improvements - The quality of passenger trains will be enhanced by upgrading certain routes to high-speed trains, improving ride stability, comfort, and passenger capacity [4] - The introduction of CR400BF-GS intelligent high-speed trains will be implemented on long-distance routes, including 6.5 pairs of high-speed trains from Dalian North to Beijing Chaoyang and Harbin West [4] Group 4: Ticketing and Information - Tickets for the new schedule are already on sale, and passengers can check train operation information and services through various channels, including the railway 12306 website and mobile app [4]
国铁沈阳局增发12列旅客列车
Xin Lang Cai Jing· 2026-01-18 22:33
Group 1 - The new train operation schedule will be implemented nationwide starting from January 26, with the Shenyang Railway Bureau increasing the number of passenger trains to 1,088, an increase of 12 trains compared to the current schedule [1] - The number of freight trains will reach 2,439, an increase of 4 trains, enhancing both passenger and freight transport capacity [1] - New daily train services will be added, including 2.5 pairs of regular trains from Changbai Mountain to Beijing and Shenyang, and 4 pairs of peak trains, supporting the high-quality development of the ice and snow tourism economy along high-speed rail lines [1] Group 2 - The transportation capacity of the Northeast hub will be strengthened with the addition of 8 pairs of regular passenger trains and 6 pairs of peak trains on various routes [1] - Optimization of train operation plans will enhance transport efficiency, including the introduction of 3 pairs of benchmark trains with fewer stops between Dalian North and Harbin West [2] - Travel times for certain passenger trains will be reduced, improving the travel experience for passengers [2] Group 3 - The quality of passenger train services will be improved, with upgrades to certain train classes and the introduction of CR400BF-GS intelligent high-speed trains, enhancing stability, comfort, and passenger capacity [2]
国铁沈阳局26日起实施新列车运行图
Xin Lang Cai Jing· 2026-01-16 23:09
Core Viewpoint - The new train operation schedule implemented by China Railway Shenyang Bureau Group Co., Ltd. aims to enhance passenger and freight transport capacity, contributing to regional economic development [1][2]. Group 1: Passenger Train Operations - The total number of scheduled passenger trains will reach 1,088, an increase of 12 trains compared to the current schedule [1]. - New daily train services will be added, including 2.5 pairs of regular trains and 4 pairs of peak trains from Changbai Mountain to Beijing and Shenyang [1]. - The adjustment will allow for 34.5 pairs of trains on the Shenyang-Jia high-speed rail segment, supporting the development of the ice and snow tourism economy in the region [1]. Group 2: Freight Train Operations - The total number of scheduled freight trains will increase to 2,439, an increase of 4 trains compared to the current schedule [1]. - New freight services will include a rapid multi-modal transport train from Changchun North to Wubai and additional intercity freight trains to enhance the transport capacity of key materials such as coal, grain, and iron ore [3]. Group 3: Service Quality Enhancements - Several passenger train services will be upgraded to high-speed trains, improving travel comfort and capacity [3]. - The fastest travel time from Changchun to Shanghai will be reduced to 9 hours and 22 minutes, a reduction of 2 hours and 5 minutes [2]. - The introduction of benchmark trains with fewer stops will improve the overall travel experience for passengers [2].