Workflow
超超临界燃煤机组
icon
Search documents
广西北海公司二期项目全容量投产
Xin Lang Cai Jing· 2025-12-30 01:32
Group 1 - The core point of the news is the successful commissioning of the 4th unit of Beihai Company, which marks the completion of all four 1 million kilowatt generator sets in the first and second phases, achieving a total installed capacity of 4 million kilowatts [1][2] - The integrated energy base "Electric Port Storage and Transportation" has been established, featuring two 100,000-ton general-purpose terminals capable of unloading global coal, along with a coal storage yard with an annual capacity of 10 million tons, forming a complete chain from unloading coal to coal-fired power generation [1][2] - The 3rd and 4th units are the most efficient and environmentally friendly coal-fired units in the Guangxi region, providing strong support for grid stability and the construction of a new power system [2] Group 2 - The company is committed to achieving "dual carbon" goals by implementing ultra-low emissions and seawater desulfurization technologies, achieving zero limestone, zero solid waste, and zero desulfurization wastewater, with emissions indicators at the regional optimal level [5] - The company is advancing the construction of a 27.29 megawatt distributed photovoltaic project, creating a green closed-loop system of "power generation—charging—carbon benefits" to effectively reduce carbon emission intensity [5] - The company aims to align with national energy security and green development strategies, ensuring energy safety through coal while enhancing development quality in the transition to a low-carbon economy [7]