Workflow
青藏铁路双寨物流中心
icon
Search documents
公铁联运“新引擎” 青藏铁路双寨物流中心投用
Yang Guang Wang· 2025-11-27 09:11
Core Insights - The Qinghai-Tibet Railway Shuangzhai Logistics Center has been fully completed and put into operation, marking a significant addition to the logistics infrastructure in the Qinghai region [1] - This logistics hub is the only second-level railway logistics base in Qinghai and serves as a key node in the national comprehensive freight hub system, enhancing logistics efficiency in the Qing-Tibet-Sichuan-Gansu region [1] Summary by Sections Project Overview - The logistics center covers over 1,470 acres and has an investment of 459 million yuan, strategically located at the intersection of multiple railways and highways, maximizing intermodal transport advantages [1] - The project is being developed in three phases, with the first phase set to enhance capacity by adding four arrival and departure lines and four freight lines by March 2024 [1] Capacity and Operations - After the project is operational, the train dispatch capacity will increase from 40 pairs per day to 60 pairs, and the annual loading and unloading capacity will rise from 3 million tons to 5 million tons [1] - The storage area for goods will reach 104,000 square meters, with 15 freight operation lines efficiently connecting to surrounding industrial parks, addressing the freight bottleneck in the Xining hub [1] Future Developments - By 2026, the logistics hub aims to upgrade to a "garden-style green highland logistics base" and plans to establish a collection and distribution center for China-Europe freight trains, facilitating better integration of Gansu and Qinghai provinces into the Belt and Road Initiative [2]