Workflow
飞轮储能项目
icon
Search documents
中国中车首个飞轮储能项目顺利并网
Core Viewpoint - The successful commissioning of the Shanxi Ruicheng 100MW/50.41MWh independent energy storage project marks China CRRC's first flywheel energy storage project, enhancing the stability of the local power system and providing a replicable management experience for energy storage projects [1][2]. Group 1: Project Overview - The project was included in the first batch of new energy storage projects in Shanxi Province in 2023 and is one of the first power frequency regulation energy storage projects in the province [2]. - The project features a total installed capacity of 100MW, with 50MW/0.41MWh from flywheel storage and 50MW/50MWh from lithium iron phosphate storage, along with a newly constructed 110kV booster station [2]. Group 2: Management and Execution - The project management team adopted a precise control and efficient collaboration management philosophy from the project's inception, ensuring high-quality progress through multi-dimensional measures [2]. - The team overcame challenges related to high technical integration and complex system coordination, completing the main construction of the energy storage base ahead of schedule [4]. Group 3: Future Plans and Strategic Importance - The successful implementation of this project validates the company's investment judgment and project management capabilities in the renewable energy sector, contributing to the establishment of an integrated energy storage business system [4]. - The company plans to optimize the operation management of the Ruicheng energy storage project and accelerate the layout of subsequent energy storage projects, aiming to build a "System+" business platform for new energy [4].