Workflow
高性能耐蚀合金N08825及N08825CLAD管材
icon
Search documents
沙特哈拉德GCP2项目打火开焊
Zhong Guo Hua Gong Bao· 2025-12-11 02:26
Core Viewpoint - The China Petroleum Pipeline Bureau has officially commenced the construction of the Haradh GCP2 renovation project in Saudi Arabia, focusing on upgrading existing gas processing facilities [1] Group 1: Project Overview - The project is located in the Haradh gas processing plant in the Eastern Province of Saudi Arabia, involving the replacement of old 6-inch pipelines with new 10-inch composite and stainless steel pipes [1] - The construction tasks include multi-diameter pipe installation ranging from 1 inch to 10 inches, scaffolding setup, pipeline welding, non-destructive testing, anti-corrosion measures, pressure testing, and nitrogen sealing [1] Group 2: Material and Technical Requirements - The project utilizes high-performance corrosion-resistant alloys N08825 and N08825CLAD, with stringent requirements for welding precision and anti-corrosion quality [1] - The project team will focus on overcoming technical challenges such as high-pressure composite pipe welding and pipe installation within existing steel structures [1] Group 3: Management and Execution - The project team adheres to Saudi Aramco's operational permit management regulations and leverages the company's established local management experience and core construction technology advantages [1] - Efficient collaboration is emphasized to ensure the high-quality advancement of the project [1]