Workflow
35kV高压直挂式构网型储能系统
icon
Search documents
储能10项!国家能源局第五批储能首台(套)重大技术装备名单正式发布
Core Viewpoint - The National Energy Administration has announced the fifth batch of major technological equipment in the energy sector, including 82 items, with a focus on energy storage technologies, highlighting the importance of innovation and supply chain security in the energy industry [2][8]. Summary by Sections Major Technological Equipment - A total of 82 technological equipment items have been included in the fifth batch of major technological equipment in the energy sector, with 10 projects specifically in the energy storage field [2][8]. - Notable energy storage systems include a 6MWh prefabricated lithium-ion battery storage system, a high-voltage direct-connected grid-type storage system, and a dynamic reconfigurable battery storage system [2][6]. Research and Development Units - Various research and development units are involved in the creation of these technologies, including China Railway Engineering Design Consulting Group, the Chinese Academy of Sciences, and Ningde Times New Energy Technology Co., Ltd. [4][5][6]. - The equipment is being developed for specific projects, such as the 155MW/310MWh storage project in Jinxing County by Times Green Energy [4][5]. User Units and Projects - User units for these technologies include major energy companies like China Huadian Corporation and Qinghai Ruineng New Energy Co., Ltd., with projects located in regions such as Qinghai and Gansu [4][5][6]. - Specific projects mentioned include a 100MW/400MWh compressed air storage project and a 250MW/1000MWh vanadium flow battery storage project [5][6]. Policy Support - The announcement outlines various policy supports for the application of these major technological equipment, including priority in planning and approval processes for related projects [8][9]. - There are provisions for non-bidding procurement methods to ensure the implementation of these technologies [9]. Reporting and Evaluation - The development units and user units are required to report progress and conduct self-evaluations after one year of operation for the projects [9][10].