Workflow
6.7兆瓦机组
icon
Search documents
金风科技:藏在跨海大桥里的绿色脉动
Xin Hua Wang· 2025-10-17 08:19
Core Viewpoint - The 2025 World Maritime Equipment Conference and the 2025 Third China Marine Equipment Expo are being held in Fuzhou, showcasing advancements in offshore wind power, particularly through the efforts of Goldwind Technology Co., Ltd. Group 1: Project Overview - The dispersed offshore wind power project developed by Goldwind Technology has been operational for over 1,300 days, achieving an average utilization rate of 99.65% and a cumulative power generation exceeding 4 billion kilowatt-hours [1] - The project, located near the Pingtan Strait Railway and Highway Bridge, utilizes five Goldwind 6.7 MW offshore wind turbines, generating approximately 116 million kilowatt-hours annually, which equates to saving 33,000 tons of standard coal and reducing carbon dioxide emissions by 96,000 tons [1] Group 2: Technological Advancements - Goldwind Technology is showcasing its technological advancements in wind power equipment, including the 6.7 MW turbines for the Pingtan project and 16 MW turbines for the Zhangpu Liuao offshore wind farm phase II project, highlighting continuous breakthroughs in offshore wind power equipment [2] - The company emphasizes a deep integration of energy with transportation, industry, and livelihood sectors, aiming to create a sustainable development model [2] Group 3: Broader Impact - As of the first quarter of 2025, Goldwind Technology has implemented over 560 zero-carbon projects globally, covering diverse sectors such as port logistics, steel manufacturing, petrochemicals, and agriculture, with the Pingtan wind power project being a representative example of this initiative [2]