Workflow
PCS变流升压一体机
icon
Search documents
成都100MW/200MWh独立储能电站储能系统采购招标
中关村储能产业技术联盟· 2025-03-10 12:11
Core Viewpoint - The article highlights the procurement announcement for the 100MW/200MWh independent energy storage project in Dengshuang, Xinjin District, Chengdu, with a total investment of approximately 220 million yuan [1]. Group 1: Project Overview - The energy storage project is located in Dengshuang Town, Xinjin District, Chengdu, covering an area of 34.37 acres and planning to construct a 100MW/200MWh lithium iron phosphate battery energy storage system [1]. - The procurement scope includes the energy storage system equipment, with a planned delivery date before March 15, 2025 [2]. - The project will utilize 20 sets of 5MW PCS (Power Conversion System) integrated machines for AC measurement capacity and 40 sets of 20-foot 5MWh lithium iron phosphate battery prefabricated cabins for DC storage capacity [2]. Group 2: Technical Specifications - The energy storage station will include a new 110kV booster station, employing a two-level boost/reduction system, with the PCS AC side voltage at 690V and the integrated machine AC side nominal voltage at 35kV [2]. - The high voltage side of the booster station will operate at 110kV, with a single bus connection on the 35kV side and a line-transformer group connection on the 110kV side [2][3]. Group 3: Industry Event - The 13th International Energy Storage Summit and Exhibition (ESIE 2025) is scheduled to take place from April 10-12, 2025, at the Capital International Exhibition Center, covering over 160,000 square meters [6]. - The event is expected to feature over 800 leading enterprises, 500 new product launches, and attract more than 200,000 professional visitors, along with 40+ thematic forums and participation from over 400 core policymakers and industry leaders [6].