Group 1: Investment Projects Overview - The first project of Jinke New Energy was launched in Xinjiang at the end of 2014, with a total installed capacity of 200,000 kW from 100 wind turbines, generating approximately 590 million kWh annually [3] - In 2015, the net profit from Huaran Dongfang's power generation business is expected to be no less than 100 million yuan, with a cumulative net profit of no less than 350 million yuan for 2016 and 2017, totaling at least 450 million yuan over three years [3] - The total investment for the second phase of the wind power project in Xinjiang is 1.565 billion yuan, with 20% funded by equity and the remaining 80% through loans [3] - A photovoltaic power station project in Shandong has a total investment of 153 million yuan, contributing to a combined total investment of 1.718 billion yuan for the two new projects [4] Group 2: Financial Performance Expectations - The expected net profit for Huaran Dongfang in 2015 is at least 100 million yuan [3] - The cumulative net profit for 2016 and 2017 is projected to be no less than 350 million yuan [3] - The total net profit over three years (2015-2017) is anticipated to be at least 450 million yuan [3]
金科股份(000656) - 2015年9月28日投资者关系活动记录表