Workflow
赤峰黄金:老挝塞班金铜矿SND项目完成首次资源估算

Core Viewpoint - Chifeng Jilong Gold Mining Co., Ltd. announced the completion of the first phase of resource exploration for the SND gold-copper project by its subsidiary, Wanxiang Mining, by the end of June 2025, with a resource estimation report issued by SRK Consulting on August 7, 2025 [1] Group 1 - The SND project has a total controlled resource of approximately 93.7 million tons with an average grade of 0.57 grams per ton of gold and 0.27% copper, using a cut-off grade of 0.40 grams per ton of gold equivalent (AuEq) [1] - The inferred resource level is estimated at 37.8 million tons with an average grade of 0.46 grams per ton of gold and 0.22% copper [1] - The total ore volume for the SND project is 131.5 million tons, with a gold equivalent grade of 0.81 grams per ton, resulting in an estimated total metal content of approximately 106.9 tons [1]