Workflow
中南空管局开展广州白云国际机场第五跑道和二号塔台启用联合实战演练

Core Viewpoint - The joint exercise conducted by the South China Air Traffic Management Bureau aims to thoroughly test the data flow between core systems at Guangzhou Baiyun International Airport in preparation for the operation of the fifth runway and the second control tower [1][4]. Group 1: Exercise Preparation and Execution - The South China Air Traffic Management Bureau placed high importance on this exercise, meticulously planning and discussing each aspect to closely align with the operational conditions expected during the transition to the new runway and tower [4]. - During the exercise, the control center deployed additional personnel for coordination, ensuring orderly operations while rapidly integrating and analyzing various information to adjust strategies as needed [4]. - The exercise was prepared from four key dimensions: "personnel, machine, environment, and management," with a clear distribution of roles and responsibilities among departments [4]. Group 2: Technical Support and System Integration - The technical support and network centers focused on ensuring the stable operation of critical equipment, real-time data transmission, and accuracy, providing robust technical support for seamless information exchange between systems [4]. - Prior to the exercise, specialized personnel were trained, and the first round of training for the upgraded TOMS version for the fifth runway was completed to ensure controllers were well-versed in the exercise plan and dual tower coordination [4]. - The exercise marks the official start of the final preparations for the operation of the fifth runway and the second control tower, with ongoing collaboration with relevant departments to ensure safety during the upcoming National Day and Mid-Autumn Festival [4].