中广核迎战“桦加沙”:所有核电项目均保持安全运行

Core Viewpoint - China General Nuclear Power Group (CGN) effectively managed the impact of Typhoon Haikuis on its nuclear power bases in Guangdong and Guangxi, ensuring all projects maintained safe operations during the storm [1][2]. Group 1: Emergency Response Measures - CGN initiated emergency responses across all nuclear projects in Guangdong and Guangxi, with a focus on safety and operational stability [1]. - The Yangjiang nuclear base implemented a "three defenses" special plan, maintaining six units in safe operation and conducting multiple risk assessment meetings [1]. - The Taishan nuclear base escalated its emergency response from September 21, issuing commands to withdraw non-emergency personnel and halt outdoor operations [1]. Group 2: Operational Status - As of September 24, all six units at the Daya Bay nuclear base were operating normally after the typhoon's westward movement led to the lifting of the warning [2]. - The Tai Ping Ling nuclear base executed its "three defenses" plan, with dynamic monitoring of unit status and reinforcement actions, resulting in a downgrade to yellow alert by 18:00 on the same day [2]. - The Fangchenggang nuclear base conducted comprehensive hazard checks, ensuring communication remained uninterrupted during the storm [2]. Group 3: Renewable Energy Projects - CGN's renewable energy projects in Guangdong took advantage of the pre-typhoon window to complete equipment inspections and facility reinforcements, maintaining real-time monitoring of wind speeds during the storm [2]. - Solar power stations in Shantou, Huizhou, and Xinfeng reported safe equipment status after the wind speed decreased, with teams conducting orderly post-disaster inspections and recovery efforts [2].