Workflow
飞机怎么组装?带你探访空客天津总装厂

Core Viewpoint - Airbus has officially launched the second assembly line for the A320 series aircraft at its Tianjin facility, which is expected to double its production capacity in China [1] Group 1: Production Capacity and Facility Overview - The Airbus Tianjin assembly plant is one of four global assembly bases and the first outside Europe [1] - The facility has delivered over 780 A320 series aircraft to various countries [1] - The total area of the assembly line is 590,000 square meters, including major component warehouses, assembly workshops, painting workshops, and delivery centers [1] Group 2: Assembly Process - The assembly process begins with the precise joining of the aircraft's two fuselage sections using thousands of rivets to ensure structural integrity during flight [2] - After the fuselage assembly, major components such as wings, landing gear, and tail fins are installed, requiring precise alignment and symmetry for safe flight [3] - The installation process includes connecting electrical, hydraulic, and flight control systems, followed by engine installation and painting, culminating in multiple test flights to ensure compliance before delivery [3]