Core Viewpoint - The construction of China's first "Hualong One" nuclear power plant using cooling towers has officially commenced with the successful pouring of the first concrete for the nuclear island, marking the full start of the Shandong Zhaoyuan nuclear power base [1][4]. Group 1: Project Details - The nuclear island at the Zhaoyuan site covers an area of over 2,000 square meters, equivalent to five basketball courts, and the pouring of 8,823 cubic meters of concrete took approximately 55 hours, executed at six points in a single pour [4]. - The "Hualong One" project utilizes a high-level natural ventilation cooling tower for the conventional island system's cooling, replacing seawater with atmospheric air as the direct cooling source, which significantly reduces water resource usage [6]. Group 2: Environmental Impact - Upon completion, the six "Hualong One" units at the Zhaoyuan nuclear project will have a total installed capacity of approximately 7.2 million kilowatts, capable of meeting the annual electricity needs of 5 million people [10]. - The project is expected to generate 50 billion kilowatt-hours of clean electricity annually, reducing standard coal consumption by about 15.27 million tons and cutting carbon dioxide emissions by approximately 46.2 million tons, equivalent to reforesting over 110,000 hectares [10].
我国再添硬“核”力量 山东招远核电基地建设全面启动