Core Insights - The first batch of new energy storage demonstration projects in Sichuan Province has successfully launched the 100MW/200MWh vanadium-lithium energy storage station in Neijiang Economic Development Zone, marking it as the first independent energy storage station on the grid side in Neijiang [1] - This project, invested and constructed by State Power Investment Corporation, is a key component of the "Chuan-Yu Energy Integration Emergency Peak Regulation Base" [1] Group 1 - The energy storage project utilizes a large-capacity storage system with advantages such as high safety, long cycle life, high efficiency, and economic viability, making it well-suited for peak regulation and emergency response needs on the grid side [1] - The equipment has undergone multiple rigorous tests to ensure stable operation under complex working conditions, providing solid infrastructure support for optimizing the energy structure and ensuring power supply in the Chuan-Yu region [1] Group 2 - To ensure high standards for project implementation, the Trina Storage project team optimized the energy storage system configuration based on regional grid characteristics and climate conditions [3] - A dedicated service team was established to respond to logistics supply, installation, and debugging needs throughout the project lifecycle, promoting seamless project construction with a "customized and full-service" approach [3] - Once operational, the project is expected to achieve an annual discharge of 36.5 million kWh, equivalent to the annual electricity supply for 20,000 urban households, significantly enhancing the peak regulation capacity of the Sichuan power grid and the level of clean energy consumption [3]
四川内江首个电网侧独立储能电站投运 助力川渝能源结构优化升级