Core Viewpoint - Yuexiu Transportation Infrastructure (01052) has awarded a construction contract to Poly Longda Engineering for the Huocun Interchange project, valued at approximately RMB 723 million, following a public bidding process through the Guangzhou Public Resources Trading Center [1] Group 1: Contract Details - The contract is to be formalized within 30 days from the issuance of the award notification [1] - Poly Longda Engineering will provide various civil engineering services for the Huocun Interchange project [1] - The total length of the construction area is 0.909 kilometers, including the reconstruction of the old main line and the construction of new bridges and interchanges [1] Group 2: Project Specifications - The main structural components include the reconstruction of the main line (total length of 909 meters) and the construction of a new separated main line bridge (total length of 150 meters) [1] - The project also involves the construction of 12 new or expanded interchange ramps, totaling 6,240.905 meters, along with a management center, service area, maintenance work area, and toll station [1]
越秀交通基建附属广州北二环公司向保利长大工程授出有关火村立交土建工程的拟议土建协议