共享模式

Search documents
西南地区首个共享储能电站在云南楚雄建成
中关村储能产业技术联盟· 2025-05-28 10:09
Core Viewpoint - The successful grid connection of the 200MW/400MWh shared energy storage power station in Chuxiong City, Yunnan Province, marks a significant advancement in optimizing the regional energy structure through innovative shared models [2][4]. Group 1: Project Overview - The energy storage station is located in Luhhe Town, Chuxiong City, with a total installed capacity of 200MW and an energy storage capacity of 400MWh [4]. - The project utilizes advanced lithium iron phosphate battery storage systems, comprising 80 battery cabinets and 40 integrated boost converter units, along with a newly constructed 220kV booster station [4]. Group 2: Environmental Impact - The expected annual charge and discharge volume is 221 million kWh, which translates to approximately 80 million kWh of converted green energy each year [4]. - This project is projected to save about 24,000 tons of standard coal and reduce carbon dioxide emissions by approximately 66,000 tons annually, contributing to innovative solutions for renewable energy consumption and grid peak regulation [4]. Group 3: Market Position - The Chuxiong shared energy storage project is the first of its kind in Southwest China, indicating a pioneering step in the region's energy market [2][5]. - Additionally, Yunnan Province is advancing its energy storage capabilities with the initiation of the first all-vanadium flow long-duration energy storage project, further enhancing its market presence [5].