Workflow
受灾群众温暖保障
icon
Search documents
打造“暖心房” 开启新生活 多元保障措施落地落实 确保受灾群众温暖过冬
Yang Shi Wang· 2025-11-17 08:21
Core Insights - The article highlights the ongoing disaster recovery efforts in Chengde, Hebei, following severe flooding in late July, with significant progress made in housing repairs and reconstruction [1][3][5] Group 1: Reconstruction Progress - As of mid-November, the reconstruction of damaged houses has advanced significantly, with 5,913 C-level dangerous houses repaired and reinforced, utilizing a total of 21.49 million yuan in government funding [3] - A total of 1,447 D-level houses are under reconstruction, with 22.44 million yuan allocated for the project, providing each household with 28,000 yuan in assistance [3] Group 2: Resettlement Efforts - For residents whose original homes are no longer suitable for living, three centralized resettlement sites have been planned, with construction progressing in various villages [5] - Some residents have already moved into newly built homes, indicating a successful transition to safer living conditions [7][9] Group 3: Winter Preparedness - As temperatures drop, Chengde city is implementing measures to ensure that disaster-affected residents stay warm during winter, including the storage of 37.7 million tons of clean coal and 7.2 million tons of biomass fuel [12][18] - The city has also repaired and distributed 283 heating devices, ensuring that each affected household receives at least one ton of fuel [18]