大湾区供水安全
Search documents
(新春走基层)珠三角水资源配置工程供水人守护大湾区供水安全
Xin Lang Cai Jing· 2026-02-23 11:27
Core Viewpoint - The article emphasizes the commitment of the personnel involved in the Pearl River Delta Water Resource Allocation Project to ensure water supply safety for the Guangdong-Hong Kong-Macao Greater Bay Area during the Spring Festival, highlighting their continuous efforts and advanced technology in monitoring and managing water resources [1]. Group 1: Operational Commitment - Engineers at the Pearl River Delta Water Resource Allocation Project are on duty 24/7 during the Spring Festival, utilizing nearly ten thousand smart sensors for real-time data feedback [3]. - The project is described as the "lifeline" for water supply in the Greater Bay Area, with personnel dedicated to maintaining a stable and safe water supply [3][5]. - The staff at the water intake source, specifically at the Liyuzhou Pump Station, are actively engaged in monitoring and ensuring water quality safety [3][4]. Group 2: Technological Integration - A comprehensive intelligent perception system has been established along the project, incorporating drones, quadruped robots, and rail-mounted cameras for thorough inspections of water sources, pump stations, and working wells [3][4]. - The integration of smart monitoring, SCADA systems, and expert systems allows for continuous analysis and diagnosis of operational data [4]. - The modern security system combines human oversight with technological defenses to ensure smooth operations [4]. Group 3: Response and Reliability - Personnel are always on standby to respond promptly to various situations, ensuring the safe and stable delivery of water to households [5]. - The commitment of the staff during the festive season reflects their dedication to providing reliable water supply services to the Greater Bay Area [5].