水沙关系调节

Search documents
2025年黄河调水调沙圆满结束 实现腾库迎汛水库排沙生态补水等多赢目标
Shui Li Bu Wang Zhan· 2025-07-15 02:03
Core Viewpoint - The Ministry of Water Resources has successfully implemented the 2025 Yellow River water and sediment regulation project, achieving multiple objectives including reservoir sediment discharge, ecological improvement, and drought resistance support [1][3]. Group 1: Project Implementation - The water and sediment regulation project lasted 18 days, with the Xiaolangdi Reservoir achieving a maximum discharge flow of 4,820 cubic meters per second and a maximum sediment concentration of 250 kilograms per cubic meter [1][2]. - The project involved coordinated operations among multiple reservoirs, including Xiaolangdi, Sanmenxia, and Wanjiazai, to optimize water management and sediment control [2][3]. Group 2: Achievements - A total of 3.36 billion cubic meters of reservoir capacity was released to ensure safety during the flood season [3]. - The Sanmenxia Reservoir achieved a net sediment discharge of 5.3 million tons, while the Xiaolangdi Reservoir discharged 16 million tons, effectively reducing sediment accumulation [3]. - The main river channel's flow capacity improved significantly, with the minimum flow capacity increasing from 1,800 cubic meters per second in 2002 to approximately 5,000 cubic meters per second currently [3]. - Ecological benefits included 1.5 million cubic meters of ecological water supply to the Yellow River Delta wetlands, enhancing biodiversity [3]. - During the project, 690 million cubic meters of water were diverted to support drought relief efforts in downstream provinces [3]. Group 3: Future Actions - The Ministry of Water Resources will continue to monitor rainfall and water conditions closely, ensuring effective flood prevention measures are in place as the country enters the critical flood season [4].
调水调沙护黄河安澜
Jing Ji Ri Bao· 2025-06-27 01:57
Core Points - The Yellow River's water diversion and sediment flushing officially commenced on June 23, 2023, with a discharge rate reaching 2,600 cubic meters per second, marking the start of the 2025 Yellow River water diversion and sediment flushing project [2] - The project aims to regulate the water-sediment relationship by artificially creating high flow rates to flush sediment from reservoirs and downstream river channels into the sea [2] - The operation will continue until approximately July 9, 2023, with a maximum discharge flow expected to reach 4,600 cubic meters per second, and over 100 million tons of sediment is anticipated to be flushed out of the reservoir [3] Water Management and Infrastructure - The Xiaolangdi Water Control Project is crucial for flood control and sediment regulation in the Yellow River basin, controlling 91.2% of the river's runoff and nearly 100% of its sediment transport [2] - The project has conducted 29 sediment flushing operations, cumulatively discharging over 2.5 billion tons of sediment, which has significantly reduced the riverbed elevation in the downstream channel by an average of 3.1 meters [3] - The maximum flood capacity of the downstream channel has increased from less than 1,800 cubic meters per second to approximately 5,000 cubic meters per second due to these operations [3] Safety and Monitoring - The management center of the Xiaolangdi Water Control Project will enhance safety monitoring and inspections during the sediment flushing process, ensuring the stable operation of the facility [3] - The project will utilize advanced monitoring systems, including a digital twin system and integrated monitoring technologies, to optimize the operation of sluice gates and enhance sediment reduction efforts [3] - The Ministry of Water Resources has outlined comprehensive arrangements for water management, hydrological monitoring, and disaster prevention during the sediment flushing period [5]