水资源配置工程
Search documents
湛江传承先辈“建库开河”精神 推进环北广东工程二期和绿美湛江生态建设
Nan Fang Ri Bao Wang Luo Ban· 2026-01-13 09:06
Core Viewpoint - The Zhanjiang Municipal Committee is accelerating the implementation of the second phase of the Guangdong Water Resource Allocation Project around the Beibu Gulf and the ecological construction of "Green Beautiful Zhanjiang," aiming to address long-standing drought issues in the Leizhou Peninsula and promote sustainable development [1][2]. Group 1: Project Overview - The second phase of the Guangdong Water Resource Allocation Project includes three main components: the Leizhou Peninsula irrigation project, the water supply and storage network project, and the construction of beautiful rural areas in Leizhou Peninsula [2]. - The project aims to create an interconnected regional water network that addresses the mismatch between water resource capacity and socio-economic development in the Leizhou Peninsula [2]. Group 2: Implementation Strategy - Zhanjiang is leveraging the successful community mobilization strategies used during the construction of the Hedi Reservoir and the Leizhou Youth Canal, organizing efforts to clear water bodies and ensure effective drainage and irrigation [2]. - The city plans to complete the main irrigation works in the Leizhou Peninsula this year, with a target of achieving an annual sediment removal task of 2.86 million cubic meters [3]. Group 3: Future Outlook - By the end of the 14th Five-Year Plan, the second phase of the Guangdong Water Resource Allocation Project aims to complete the construction of 4.5 million acres of large-scale irrigation areas and establish a basic regional water network [3]. - By 2035, the integration of the water network and ecological construction in the Leizhou Peninsula is expected to create a vibrant landscape characterized by fertile fields and a thriving economy [3].
行走江河看中国|这条“地下水龙”如何越山而来润泽湾区?
Zhong Guo Xin Wen Wang· 2025-10-15 07:52
Core Viewpoint - The article highlights the historical and ongoing efforts to address water scarcity in Hong Kong through significant engineering projects, emphasizing the importance of water resource management in the Greater Bay Area [1] Group 1: Historical Context - Over 60 years ago, Hong Kong faced severe water shortages, known as "water scarcity" [1] - The Dongjiang-Shenzhen water supply project was initiated to bring water from Dongjiang, symbolizing deep national ties [1] Group 2: Current Developments - The Pearl River Delta water resource allocation project, described as a "subterranean water dragon," is currently underway [1] - This project features an average depth of 60 meters and a total length of 113.2 kilometers, aimed at enhancing water supply in the Greater Bay Area [1]
滇中引水工程刷新建设“进度条” 一期工程隧洞合计掘进710.4公里
Zhong Guo Xin Wen Wang· 2025-07-11 16:51
Group 1 - The Dianzhong Water Diversion Project is the largest water resource allocation project in Southwest China, with the first phase of the project achieving a total excavation of 710.4 kilometers for main tunnels, branch tunnels, and shafts [1][2] - As of June 2025, the water source project of the first phase has fully entered the equipment installation stage, with 93.2% of the water conveyance project completed, totaling 618.7 kilometers out of 664 kilometers [1] - The project faces "six world records" and "ten world-class technical challenges," making it a significant engineering feat in the field of water resources [1] Group 2 - Upon completion, the Dianzhong Water Diversion Project is expected to divert 3.4 billion cubic meters of high-quality water annually to central Yunnan, alleviating water supply conflicts for urban production and living, and improving the ecological and water environment of rivers and lakes in the region [2] - The project will benefit over 11 million people along the route, enhancing the quality of life and environmental conditions [2]