Workflow
海外油气项目投产
icon
Search documents
中国海油宣布圭亚那Yellowtail项目已提前投产
Xin Lang Cai Jing· 2025-08-08 14:44
Core Insights - CNOOC announced the early production commencement of the Yellowtail project in Guyana, located in the Stabroek block at a water depth of 1600-2100 meters [1] Group 1: Project Details - The Yellowtail project includes one Floating Production Storage and Offloading (FPSO) unit and one subsea production system, with plans for 26 production wells and 25 water injection wells [1] - The FPSO is the largest in the Stabroek block, designed with a storage capacity of approximately 2 million barrels [1] Group 2: Production Capacity - The Stabroek block currently has an average daily crude oil production of about 650,000 barrels from the Liza Phase 1, Liza Phase 2, and Payara projects [1] - The Yellowtail project is expected to add a production capacity of 250,000 barrels per day, increasing the total production capacity of the Stabroek block to 900,000 barrels per day [1]