节水工作
Search documents
“十四五”时期我国用水总量实现零增长
Ke Ji Ri Bao· 2026-01-21 01:08
Core Insights - The Ministry of Water Resources held a national meeting on water conservation, highlighting significant achievements during the 14th Five-Year Plan period, including zero growth in total water usage amid economic development and stable grain production [1] - By 2025, water usage per unit of GDP and industrial added value is expected to decrease by 20% and 25% respectively compared to the end of the 13th Five-Year Plan, with effective irrigation water utilization in farmland increasing from 0.565 to 0.583 and unconventional water usage rising by over 91% [1] Summary by Categories Achievements in Water Conservation - Significant progress has been made in eight areas: policy framework construction, water budget management reform, water quota management, construction of a water-saving society, development of the water-saving industry, management of recycled water utilization, contract water-saving management, and water-saving education [1] Future Goals and Plans - By 2030, water usage per unit of GDP and industrial added value is targeted to decrease by over 10% compared to 2025, with effective irrigation water utilization reaching above 0.6 and the water-saving industry scale exceeding 1.2 trillion yuan [2] - Unconventional water usage is expected to surpass 30 billion cubic meters, with recycled water utilization rates in severely water-scarce and overloaded areas reaching over 30%, and a target of over 70% for mine water utilization in the Yellow River basin [2] Strategic Focus for the 15th Five-Year Plan - The meeting emphasized the need to enhance total water resource management and comprehensive conservation systems by 2026, improve the intensive and safe utilization of water resources, and promote the construction of a high-quality water-saving society [2]
储水量增加8.6亿立方米,昌平区地下水位连续九年回升
Xin Jing Bao· 2025-08-27 08:42
Core Insights - The groundwater level in Changping District has shown continuous improvement, with a rise of 3.92 meters compared to the same period last year, reaching 12.29 meters as of late August this year, marking nine consecutive years of increase [1] - The total groundwater storage has increased by 860 million cubic meters since 2015, with the Machikou water source seeing an average rise of 5.36 meters, setting a new historical high [1] Group 1: Water Resource Management - Changping District has achieved ecological replenishment exceeding 156 million cubic meters this year, optimizing water resource allocation with a coordinated replenishment plan [1] - The plan includes integrating Bai Fuquan ecological replenishment into the city's scheduling, establishing multiple water supply paths, and deploying monitoring equipment for precise management [1] Group 2: Reduction of Groundwater Extraction - The district is actively replacing groundwater sources with surface water, with the newly built Changping New Town surface water plant gradually replacing groundwater extraction from older plants [2] - Since 2021, 10 well replacements have been completed, reducing groundwater extraction by approximately 440,000 cubic meters annually [2] Group 3: Water Conservation Efforts - Changping District has implemented rainwater collection systems in new projects, increasing rainwater collection capacity by 310,000 cubic meters since 2021, and has developed 47.8 square kilometers of sponge city areas [2] - The district has also enhanced the utilization of recycled water, producing 11.8 million cubic meters last year, which serves as a significant supplementary source for ecological replenishment [2] - Efforts to improve water-saving hardware have led to the replacement of over 55,000 water-saving devices, achieving a 99.6% penetration rate of water-saving fixtures in urban areas [2]