Workflow
零碳清漂
icon
Search documents
我国首艘内河纯电动清漂转运船正式完成试航交付
Ke Ji Ri Bao· 2025-08-25 08:46
Core Viewpoint - The successful trial operation of the "Three Gorges Dam 1" marks a significant advancement in the development of electric-powered vessels for environmental protection in China's inland waterways [1][3]. Group 1: Vessel Specifications and Capabilities - "Three Gorges Dam 1" is the first pure electric debris collection and transport vessel in China's inland rivers, measuring 82 meters in length, 13.76 meters in width, and 4 meters in depth, with a maximum draft of 3.25 meters [2]. - The vessel is equipped with dual engines and propellers, allowing for a cruising range of up to 150 kilometers, and features two box-type power sources that resemble shipping containers [2]. - During flood seasons, the vessel can effectively locate, collect, and transport floating debris, ensuring the safety of the Three Gorges project [2]. Group 2: Environmental Impact and Economic Benefits - The "Three Gorges Dam 1" is estimated to replace 253.4 tons of fuel annually, leading to a reduction of 842.4 tons of carbon dioxide emissions [4]. - Compared to traditional powered vessels, this electric vessel offers better environmental and economic benefits, supporting the green development of inland shipping [4].