Workflow
风光火储多能互补
icon
Search documents
带动上下游投资超千亿元 疆电千里入巴渝(经济新方位·重大工程一线)
Ren Min Ri Bao· 2025-06-10 21:55
Core Viewpoint - The Hami-Chongqing ±800 kV UHVDC project has been put into operation, significantly enhancing the electricity transmission capacity from Xinjiang to Chongqing, with a distance of 2260 kilometers covered in approximately 0.007 seconds [1][2]. Group 1: Energy Supply and Demand - The electricity demand in Chongqing has been growing at an annual rate of 6%, with a projected growth rate of 11% in 2024, while Xinjiang is rich in energy resources, making it a crucial source for electricity transmission to the east [2]. - The project includes 14.2 million kW of power sources, with over 10.2 million kW coming from wind, solar, and thermal energy, resulting in a renewable energy installation ratio exceeding 70% [2]. Group 2: Technological Innovations - The project faced challenges such as harsh environmental conditions and complex construction logistics, but innovative technologies were employed to enhance construction efficiency and address difficulties [3]. - The ±800 kV converter station in Hami features 14 converters, each with a capacity of approximately 400,000 kW, achieving over 90% localization of equipment [3]. Group 3: Economic Impact - The Hami-Chongqing project has stimulated over 100 billion yuan in upstream and downstream investments, creating more than 10,000 jobs directly related to the project and over 30,000 jobs in related sectors such as equipment manufacturing and energy services [4]. - Hami has developed a wind power equipment manufacturing base, with local supply rates exceeding 70%, significantly boosting the output value of the power transmission and transformation equipment manufacturing industry by 20 billion yuan [4].
这条特高压够绿!——走近我国第三条“疆电外送”直流大动脉
Xin Hua She· 2025-05-23 22:52
Core Points - The Hami-Chongqing ±800 kV UHVDC project is a significant infrastructure initiative aimed at transmitting clean energy from Northwest China to Chongqing, covering a distance of approximately 2,290 kilometers and passing through five provinces [2][4] - The project boasts a high proportion of renewable energy, with over 70% of its 14.2 million kW capacity coming from wind, solar, and thermal sources, setting a new record for similar projects [3][4] - Upon completion, the project is expected to deliver 36 billion kWh of electricity annually to Chongqing, significantly reducing coal consumption and CO2 emissions [4] Investment and Economic Impact - The Hami UHVDC project has an investment of 28.6 billion yuan, which has stimulated over 100 billion yuan in upstream and downstream investments, creating more than 40,000 jobs [8][9] - The project is fostering the growth of the renewable energy equipment manufacturing industry in Hami, with local production of wind power equipment contributing to a 20 billion yuan increase in the output value of the power transmission and transformation equipment manufacturing sector [9] - The establishment of a comprehensive industrial chain from research and development to operation and maintenance is being facilitated by the project, promoting a green economy in the region [9] Technological Innovations - The project employs advanced technologies to address extreme weather challenges, including a new double-arm support technology that enhances wind resistance by 50% and improves construction efficiency [5][6] - The use of domestically produced ±800 kV converter transformers, with a capacity of approximately 400,000 kW each, highlights the project's commitment to local manufacturing [7] Future Developments - The project is part of a broader strategy to transform Xinjiang into a national energy security base, with plans for additional UHVDC and AC transmission channels to further leverage the region's resource advantages [9]
铁岭县风电新能源装备制造项目进入冲刺阶段
Liao Ning Ri Bao· 2025-05-13 01:46
Group 1 - The Tieling County Wind Power New Energy Equipment Manufacturing Project is part of a larger initiative in Tieling City aimed at integrating multiple energy sources, with a total investment of 2.24 billion yuan [1][2] - The project is being developed by Mingyang New Material Technology (Tieling County) Co., Ltd. and Tieling Ticheng New Energy Development Co., Ltd., and is structured in three phases [1] - The first phase of the project is nearing completion, with the production facilities, including the blade factory and comprehensive building, already constructed [1] Group 2 - The blade factory is the largest single wind turbine blade production facility in the province, measuring 650 meters in length, 151 meters in width, and 24 meters in height, covering an area of 100,000 square meters [1][2] - Upon completion of the first phase, the project is expected to produce 1,200 wind turbine blades and 10,000 nacelle covers annually, generating an annual output value of 1.2 billion yuan and tax revenue of 50 million yuan, while creating 1,500 jobs [2]