Wind Power
Search documents
“建风电项目挖山致山体裂缝”?当地通报
券商中国· 2025-06-17 23:17
Group 1 - The core issue involves the construction of a wind power project in Ling Shan County, Guangxi, which has been accused of causing environmental problems such as muddy drinking water and mountain cracks [1] - A joint investigation team has been established by the local government to address these concerns, leading to a halt in construction for rectification [1] - Initial findings indicate that the muddy water issue reported by residents was due to heavy rainfall rather than construction activities, and measures are being taken to ensure safe drinking water for affected villagers [1] Group 2 - The project has received all necessary approvals, including construction permits and environmental impact assessments [1] - The reported mountain cracks were attributed to inadequate slope protection and temporary soil disposal, exacerbated by heavy rainfall, rather than geological issues [1] - The local government has mandated the project owner to repair the affected areas and improve site management practices [1]
Boralex reports net earnings of $41 million for the first quarter of 2025 and the start of production at the Limekiln wind farm, its first operational project in the United Kingdom
Globenewswire· 2025-05-14 11:00
Core Insights - Boralex Inc. reported a challenging first quarter in 2025, with lower production and financial metrics compared to the same period in 2024, primarily due to unfavorable wind conditions in France and lower contributions from short-term contracts [3][8][12] Financial Results - EBITDA(A) for Q1-2025 was $176 million, down from $195 million in Q1-2024, reflecting a decrease of 10% [8][12] - Operating income decreased to $65 million in Q1-2025 from $106 million in Q1-2024, a decline of 39% [8][12] - Net earnings fell to $41 million in Q1-2025, down $32 million from $73 million in Q1-2024, representing a 44% decrease [8][12] - Power production was 1,691 GWh in Q1-2025, a 4% decrease from 1,767 GWh in Q1-2024, and 10% below anticipated production [11][12] Development and Construction Activities - The commissioning of the Limekiln wind farm in Scotland marks a significant step in Boralex's growth strategy in the UK [3] - Ongoing construction projects include the Apuiat wind project in Québec (200 MW), Hagersville (300 MW), and Tilbury (80 MW) storage projects in Ontario, with commissioning planned for late 2025 [8][12] - A total of 129 MW has been added to the early-stage project pipeline, contributing to a total of 8 GW of projects in various stages of development [8][14] Cash Flow and Financial Position - Net cash flows related to operating activities were $172 million in Q1-2025, down from $230 million in Q1-2024 [8][28] - Discretionary cash flows decreased to $74 million in Q1-2025 from $78 million in Q1-2024 [8][28] - As of March 31, 2025, Boralex had $388 million in cash and cash equivalents and $504 million in available cash resources and authorized financing [8][30] Strategic Outlook - Boralex's 2025 Strategic Plan focuses on growth, diversification, customer engagement, and optimization, continuing from the previous plan launched in 2019 [13][14] - The company plans to bid on multiple projects under upcoming calls for tender in its target markets [4][14] - An Investor Day is scheduled for June 17, 2025, to share updates on the 2025-2030 strategic plan [4]
印度风电行业步入复苏轨道 本地造风机成为明星
news flash· 2025-05-08 09:55
Core Insights - The Indian wind power industry is on a recovery track, achieving growth for four consecutive years, contrasting sharply with the decline experienced during the COVID-19 pandemic and the period following the introduction of competitive bidding in 2017 [1] Industry Summary - The revival of the wind power sector is marked by significant order increases for local wind turbine manufacturers, particularly Suzlon and Inox Wind [1] - Both companies are expected to report positive net profits for the first time in eight years, indicating a strong turnaround in their financial performance [1]
Limekiln Wind Farm, Scotland: Boralex’s First Production Site in the United Kingdom Now Operational
Globenewswire· 2025-04-01 11:00
Core Points - Boralex has successfully operationalized the Limekiln Wind Farm, marking its first operational site in the UK with an installed capacity of 106 MW [1][2] - The project aims to enhance Boralex's strategic position in the UK, contributing to its goal of increasing renewable energy assets to 1 GW by 2030 [2] - The wind farm consists of 24 Vestas V136-4.5MW turbines and is expected to provide electricity for approximately 100,000 British homes annually [2][4] Company Growth and Development - Since 2023, Boralex has expanded its UK team from 10 to 23 professionals and plans to recruit over a dozen more by the end of the year [6] - The company has achieved significant milestones, including financing closure and signing a Corporate Power Purchase Agreement (PPA) for the Limekiln Wind Farm [6] - Boralex has also acquired additional projects, including Sallachy (up to 50 MW) and Clashindarroch Extension (145 MW and 50 MW storage) [6] Economic and Environmental Impact - The Limekiln Wind Farm will create at least 8 direct jobs and around 50 indirect jobs in the local community [4] - The project includes a Community Benefit Fund of over £500,000 annually, alongside biodiversity enhancements and a peat restoration program [2][4] - The wind farm benefits from a 15-year government-backed Contract for Difference (CfD) starting in April 2028, with a PPA in place with Statkraft for the interim period [3]