Workflow
供热工程
icon
Search documents
投入2.17亿元提升群众居住品质
Xin Lang Cai Jing· 2025-12-23 20:11
Group 1 - The core focus of the news is on improving living conditions in Haibei Tibetan Autonomous Prefecture, with significant investments made in urban and rural housing projects to address the urgent needs of the community [1][2] - A total of 217 million yuan has been invested to enhance the living environment and quality of life for urban and rural residents [1] - 18.16 million yuan has been allocated for the renovation of 1,040 old urban residential units and the reinforcement of 32 shanty houses [1] Group 2 - An investment of 66.4 million yuan has been made to improve living conditions for 3,000 rural residents, including the implementation of external wall insulation over 212,000 square meters [2] - Seven "Harmonious Village" construction projects are progressing, with 33.8 kilometers of village roads renovated to strengthen rural infrastructure [2] - A dynamic monitoring mechanism has been established for housing safety, with an investment of 4.62 million yuan completing seismic upgrades for 197 rural homes [2]
视频丨北极深潜、枢纽封顶、热脉贯通 中国工程再突破
Huan Qiu Wang Zi Xun· 2025-10-28 23:58
Group 1: Major Achievements in Infrastructure and Exploration - China has achieved historic breakthroughs in major engineering and frontier exploration, including the world's only continuous manned deep-sea diving in the Arctic, the completion of the main structure of Xi'an East Station, and the connection of the longest long-distance heating pipeline in the country [1] Group 2: Arctic Manned Deep-Sea Diving - The Arctic manned deep-sea diving team successfully completed 43 diving missions using the "Fendouzhe" manned submersible, in collaboration with the "Jiaolong" submersible, marking a new model of underwater cooperative operations [2][4] - The team conducted the first manned deep-sea scientific exploration in the Arctic ice zone, reaching a maximum depth of 5,277 meters, and collected valuable samples and observation data to support research on rapid climate change in the Arctic [4] Group 3: Xi'an East Station - The main structure of Xi'an East Station, a key project in China's 14th Five-Year Plan, has been completed, covering a total area of 394,000 square meters and featuring 13 platforms and 27 tracks [5][8] - The station is expected to handle over 36.5 million passengers annually, significantly alleviating passenger flow pressure in the Xi'an railway hub [5] Group 4: Long-Distance Heating Pipeline - The "Liaohuo into Jinan" project, which utilizes waste heat from a power plant in Liaocheng to provide heating for Jinan, has achieved full-line connection, with a total length of 110 kilometers and a diameter of 1.6 meters, making it the longest and largest heating pipeline in China [9][12] - The project is expected to reduce coal consumption by 1.2989 million tons and cut carbon dioxide emissions by 3.564 million tons each heating season, equivalent to the carbon sequestration of four Saihanba forest farms in a year [12]