储能电站EPC服务
Search documents
广东建工:子公司签订18.88亿元储能电站EPC合同
Zheng Quan Shi Bao Wang· 2025-11-24 11:45
Core Viewpoint - Guangdong Construction (002060) has signed an EPC contract worth 1.888 billion yuan for the Shenzhen Shenshan Special Cooperation Zone energy storage project, which is expected to enhance the company's construction business scale and profitability by 2025 [1][2]. Group 1: Contract Details - The contract is for the design and construction of a 300MW/1200MWh electrochemical energy storage power station, consisting of four main components: storage system, booster station, outgoing lines, and expansion of the opposite side [2]. - The total contract amount is 1.888 billion yuan, with Guangdong Yuan Tian responsible for 1.876 billion yuan of the engineering tasks, and the contract duration is set for 120 days [1][2]. Group 2: Responsibilities and Obligations - The client, Shenzhen Blue Jun, is responsible for project filing procedures, providing necessary design materials, organizing construction drawing reviews, and ensuring timely payment as per the contract [2]. - Guangdong Yuan Tian and Guangdong Zhen Sen must comply with legal regulations, complete all work as per the contract and supervisor's instructions, and ensure safety and ecological protection measures during construction [2]. Group 3: Strategic Implications - The project is expected to expand the company's engineering construction business scale and improve profitability, positively impacting the company's operating performance in 2025 [2].