华润电力蒲圻三期项目5号机组
Search documents
华润电力蒲圻三期项目5号机组转入商业运营
Ke Ji Ri Bao· 2025-09-05 08:52
Core Viewpoint - China Resources Power's Puguqi Phase III project has successfully transitioned to commercial operation after completing a 168-hour full-load trial run, marking a significant milestone in the region's energy infrastructure development [1][3]. Group 1: Project Overview - The Puguqi Phase III project is a key initiative in Hubei Province's "14th Five-Year" energy planning, aimed at optimizing the regional energy structure and strengthening power supply security [3]. - The project construction team overcame challenges such as extreme weather and tight equipment supply, achieving all critical milestones successfully during the construction phase [3]. Group 2: Technological and Environmental Impact - The project utilizes internationally advanced ultra-supercritical secondary reheating technology, along with efficient dust removal, desulfurization, and denitrification facilities [3]. - The designed coal consumption for power generation is 20 grams per kilowatt-hour lower than traditional single reheating units, which will lead to an annual reduction of nearly 220,000 tons of carbon dioxide emissions [3]. Group 3: Economic Contribution - Once fully operational, the project is expected to generate an annual electricity output of 9 billion kilowatt-hours, significantly enhancing grid regulation capabilities and facilitating the consumption of renewable energy in southeastern Hubei [3]. - The project will provide a stable baseload power source for the Yangtze River Economic Belt, contributing to Hubei Province's goal of building a "clean, low-carbon, safe, and efficient" modern energy system [3].